Line 33: | Line 33: | ||
!'''Release Date''' | !'''Release Date''' | ||
!'''Purpose''' | !'''Purpose''' | ||
+ | |- | ||
+ | |'''[https://wiki.gccollab.ca/images/2/29/CN61_Orientation_de_Site_Code_QR_Install%C3%A9_-_Site_Wayfinding_QR_Code_Installed.pdf Site Wayfinding QR Code]''' | ||
+ | |February 16, 2023 | ||
+ | |||
+ | |To provide a quick and paperless link to wayfinding on Portage III and Portage IV's site as part of the Place du Portage III AWR Project. | ||
|- | |- | ||
|'''[https://wiki.gccollab.ca/images/c/c6/CN54.2_Tour_D_et_E_Delimitation_et_Palissade_de_construction_-_Tower_D_and_E_Delineation_Hoarding_%28002%29.pdf Towers D & E: Delineation and Hoarding Wall (UDPATED)]''' | |'''[https://wiki.gccollab.ca/images/c/c6/CN54.2_Tour_D_et_E_Delimitation_et_Palissade_de_construction_-_Tower_D_and_E_Delineation_Hoarding_%28002%29.pdf Towers D & E: Delineation and Hoarding Wall (UDPATED)]''' |
Revision as of 14:06, 23 February 2023
Français |
Project overview | Project phases and milestones | Objectives and benefits | Notices to building occupants | More information |
Notices to tenants/occupants
Tenants of PDP3 and adjacent buildings have been informed of construction work through operational notices issued by BGIS, with PSPC’s informal consent. Notices issued to date are provided below. This list will be updated regularly.
Title (link) | Release Date | Purpose |
---|---|---|
Site Wayfinding QR Code | February 16, 2023 | To provide a quick and paperless link to wayfinding on Portage III and Portage IV's site as part of the Place du Portage III AWR Project. |
Towers D & E: Delineation and Hoarding Wall (UDPATED) | February 15, 2023 | To outline and separate the occupied space from the demolition and abatement activities. |
Notice of Tower Crane (TC-2) Installation | February 15, 2023 | To install a tower crane (TC-2) within the construction zone in front of Place du Portage III Tower B on Laurier Street. |
Electrical Shutdown in Laurier-Taché Parking Garage (Maisonneuve Sector) (UPDATED) | February 8, 2023 | To proceed with scheduled Tower C electrical maintenance. |
Tower A: Storm and Sanitary Pipe Installation (UPDATED) | February 3, 2023 | To demolish the existing pipe and reinstall a new underground sanitary and storm one in L03 (A0314) in Tower A. |
Tower Crane 2 (TC-2): Structural Steel Upgrades (UPDATED) | January 27, 2023 | To allow for the tower crane openings that are required for its erection in the Laurier-Taché Parking Garage through levels P1, P2 and P3. |
Mission Critical Spaces (L15) | January 27, 2023 | To complete A1 and A2 Towers construction fit up, to accommodate B1 Tower tenants. |
Tower B3: Delineation and Hoarding Wall (L0) | January 20, 2023 | To outline and separate the occupied space from the demolition and abatement activities. |
Tower B3: Delineation and Hoarding Wall (L01 & L02) | January 19, 2023 | To outline and separate the occupied space from the demolition and abatement activities. |
Tower Crane Installation in Laurier-Taché Parking Garage (UPDATED) | January 19, 2023 | To prepare the site for the construction and installation of the tower crane (TC-2). |
Tower E: Construction of Partition Wall | January 6, 2023 | To outline and separate the occupied space from the bulk of demolition and abatement activities while the Security Operations Centre remains in place (02B2-101). |
Temporary Disruption to the Laurier-Taché Parking Garage Door Operators (CANCELED) | January 3, 2023 | To remove, then relocate the fiber optic cables, including conduits and boxes that control the garage door openers within the Laurier-Taché parking garage. The conduits and boxes are currently located in L02 in Tower C on a block wall that is scheduled to be demolished. |
Opening of Interim Mailroom | December 19, 2022 | To move the mailroom occupants from the old location in Tower B3 to the new location in Tower B2.
Note: The old mailroom location is scheduled for demolition as part of phase 1 of the PDP3 AWR Project. |
Tower B: Exterior Demolition (UPDATED) | December 19, 2022 | To install temporary new stairs to allow emergency access and egress during construction activities and demolish existing stairs. |
Preparation of the Mobile Crane Base | December 14, 2022 | To prepare the base, a granular pad, for the installation of the mobile crane on Laurier Street, which is to assist with the installation of the Tower Crane (TC-2) within the exterior construction zone of Tower B. |
Tower C: Removal of Emergency Generator | December 2, 2022 | To disconnect Tower C generator and then reconnect the feeds to the generators in Towers A and B to ensure backup electricity in the event of an electrical power outage. |
Installation and Mobilization of Mast Climbers | December 2, 2022 | To assist in the removal of the exterior envelope of Towwers C1/C2. |
Temporary Shutdown of Primary Chilled Water Loop (UPDATED) | November 25, 2022 | To directly reconnect critical mechanical equipment (V-30, V-72 and V-74) to the primary chilled water loop to accommodate the demolition of the pumps and heat exchangers in Tower C Level 02. Space in the mechanical room is required for construction of the concrete shear wall and associated re-shoring. |
Tower C: Emergency Generator Removal | November 18, 2022 | To disconnect the Tower C generator and then reconnect its emergency load to the generator control panel in Tower B to ensure backup electricity in the event of an electrical power outage. |
Tower B1 - Level 0: Construction Hoarding (UPDATED) | November 17, 2022 | To create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project. |
Towers B1 & B3: Demolition and Construction Activities (L1, L2 & L3) | November 17, 2022 | To complete Place du Portage III Asset and Workplace Renewal (PDP3 AWR) Project scheduled renovations. |
Towers B1 & B3: Demolition and Construction Activities (L6 to L12) | November 17, 2022 | To complete Place du Portage III Asset and Workplace Renewal (PDP3 AWR) Project scheduled renovations. |
Erection of Tower Crane (TC-1) in the construction area between PDP3 and PDP4 (Woodlands area) | October 11, 2022 | The erection of the tower crane (TC-1) is one of the PDP3 AWR Project milestones as it visually symbolizes the beginning of the demolition activities. |
Bicycle Enclosure Relocation | September 6, 2022 | To facilitate the additional site logistics required for the Construction Manager to install exterior hoarding in preparation for construction work around PDP III Tower C. |
Towers C and D Closure: Pedestrians Wayfinding Plans (Exterior) | September 6, 2022 | How to circulate between PDP4 and the A/B/E towers of PDP3 (exterior). |
Towers C and D Closure: Pedestrians Wayfinding Plans (Interior) | September 6, 2022 | How to circulate between PDP4 and the A/B/E towers of PDP3 (interior). |
Sidewalk Closure: Laurier Street | August 16, 2022 | To facilitate the additional site logistics required for the Construction Manager (CM) to isolate the access to egress for site deliveries, loading and unloading. The implementation of this measure is also to ensure the safety and protection of the public and to contain the construction site within the hoarding walls. |
Traffic Lane Closure: Laurier Street | August 16, 2022 | To facilitate the additional site logistics required for the Construction Manager (CM) to isolate the access to egress for site deliveries, loading and unloading. The implementation of this measure is also to ensure the safety and protection of the public and to contain the construction site within the hoarding walls. |
Place du Portage IV: Wayfinding | August 2, 2022 | To facilitate the construction renovations, including the Tower C Curtainwall Upgrades; Tower C Interior Upgrades; and Structural Upgrades for the Place du Portage AWR Project. |
Temporary Partial Closure: Laurier-Taché Parking Garage | August 2, 2022 | To facilitate the following renovations: installation of a new elevator pit; an interruption in the ventilation system; structural upgrades; and replacement of underground piping. |
Hoarding Wall: Tower B Exterior | July 29, 2022 | To facilitate the additional site logistics required for the Construction Manager (CM) to isolate the access to egress for site deliveries, loading and unloading. The implementation of this measure is to ensure the safety and protection of the public and to contain the construction site within the hoarding walls. |
Sidewalk and Lane Closure on Maisonneuve Boulevard | May 24, 2022 | To facilitate the additional site logistics required for the CM and to isolate the access to egress for site deliveries, loading and unloading. Additionally, the measures are required to ensure the safety and protection of the public and to contain the construction site within the hoarding walls. |