Difference between revisions of "Place du Portage III AWR Notices to tenants/occupants"
Jump to navigation
Jump to search
Line 43: | Line 43: | ||
|To facilitate the additional site logistics required for the Construction Manager (CM) to isolate the access to egress for site deliveries, loading and unloading. The implementation of this measure is to ensure the safety and protection of the public and to contain the construction site within the hoarding walls. | |To facilitate the additional site logistics required for the Construction Manager (CM) to isolate the access to egress for site deliveries, loading and unloading. The implementation of this measure is to ensure the safety and protection of the public and to contain the construction site within the hoarding walls. | ||
− | |||
− | |||
− | |||
− | |||
− | |||
|- | |- | ||
|'''[https://wiki.gccollab.ca/images/d/d2/GOC479411-PDP_3_AWR-Place_de_Portage_IV_Bike_Storage.Final.pdf Relocation of the bicycle storage shelter at Tower C2 entrance hall at Level 02]''' | |'''[https://wiki.gccollab.ca/images/d/d2/GOC479411-PDP_3_AWR-Place_de_Portage_IV_Bike_Storage.Final.pdf Relocation of the bicycle storage shelter at Tower C2 entrance hall at Level 02]''' |
Revision as of 09:52, 2 August 2022
Français |
Project overview | Project phases and milestones | Objectives and benefits | Notices to building occupants | More information |
Notices to tenants/occupants
Tenants of PDP3 and adjacent buildings have been informed of construction work through operational notices issued by BGIS, with PSPC’s informal consent. Notices issued to date are provided below. This list will be updated regularly.
Title (link) | Release Date | Purpose |
---|---|---|
Temporary Partial Closure: Laurier-Taché Parking Garage | August 2, 2022 | To facilitate the following renovations: installation of a new elevator pit; an interruption in the ventilation system; structural upgrades; and replacement of underground piping. |
Hoarding Wall: Tower B Exterior | July 29, 2022 | To facilitate the additional site logistics required for the Construction Manager (CM) to isolate the access to egress for site deliveries, loading and unloading. The implementation of this measure is to ensure the safety and protection of the public and to contain the construction site within the hoarding walls. |
Relocation of the bicycle storage shelter at Tower C2 entrance hall at Level 02 | July 29, 2022 | To facilitate the additional site logistics required for the Construction Manager to install exterior hoarding in preparation for construction work. |
Tower A and B Delineation Hoarding | July 14, 2022 | Outline and separate the occupied space in Tower A2 from the construction activities in Tower B1. |
Interim Mailroom Demolition and Abatement | July 14, 2022 | See notice |
Sidewalk and Lane Closure on Maisonneuve Boulevard | May 24, 2022 | To facilitate the additional site logistics required for the CM and to isolate the access to egress for site deliveries, loading and unloading. Additionally, the measures are required to ensure the safety and protection of the public and to contain the construction site within the hoarding walls. |
Construction Hoarding: Tower C - North Courtyard | May 24, 2022 | To facilitate the additional site logistics required for the Construction Manager and to isolate the access to egress for site deliveries, loading and unloading. Additionally, the measures are required to ensure the safety and protection of the public and to contain the construction site within the hoarding walls. |
Construction Hoarding: Tower B - Exterior | May 24, 2022 | To facilitate the additional site logistics required for the Construction Manager and to isolate the access to egress for site deliveries, loading and unloading. Additionally, the measures are required to ensure the safety and protection of the public and to contain the construction site within the hoarding walls. |
Construction hoarding activities | April 6, 2022 | The main objective of the construction hoarding activities is to create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project. |
Environmental Soil Study Characterization | April 5, 2022 | To help identify potential contaminants in the soil in and around the project area. Information gathered during this work will help describe the environmental quality of the soil. |
Tree Removal Activities | March 25, 2022 | To facilitate additional site logistics requirements for the Construction Manager (CM) to enable construction related activities in preparation of the PDP3 AWR Project and to update the landscape and riverfront greenbelt in connection to the complex. |
Construction hoarding activities (Interim space) | February 22, 2022 | To create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project. |
Construction hoarding (CM site) | February 17, 2022 | To create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project. |
Construction hoarding | February 11, 2022 | To create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project. |
Tree removal activities (Woodland Area) | February 9, 2022 | To create an interim construction laydown area for the CM to enable construction related activities in preparation of the PDP3 AWR Project; and an opportunity to update the landscape and Riverfront Greenbelt connection to the complex. |