Changes

Jump to navigation Jump to search
Made updates to Phase I information
Line 137: Line 137:  
The majority of the cards from our first design sprint were completed. The DCD team got together and categorized elements into different sprints, for a total of 8 sprints to complete Phase I. We created a project timeline (see below) to determine dates and expectations for Phase I, with the last sprint completing on May 2, 2018. At this point all the elements (incl. design files, documentation and code) will be available on Github. This UI Kit and documentation will be useful for prototyping new products and features.  
 
The majority of the cards from our first design sprint were completed. The DCD team got together and categorized elements into different sprints, for a total of 8 sprints to complete Phase I. We created a project timeline (see below) to determine dates and expectations for Phase I, with the last sprint completing on May 2, 2018. At this point all the elements (incl. design files, documentation and code) will be available on Github. This UI Kit and documentation will be useful for prototyping new products and features.  
 
* '''[[:File:Design System Update Jan 24.pptx|Update_January 24]]'''
 
* '''[[:File:Design System Update Jan 24.pptx|Update_January 24]]'''
 +
 
'''January 10'''
 
'''January 10'''
   Line 146: Line 147:  
* [[:File:Design System Update Jan 10.pptx|'''Presentation: Update_January 10_DCD Meeting''']]
 
* [[:File:Design System Update Jan 10.pptx|'''Presentation: Update_January 10_DCD Meeting''']]
 
* '''Presentation: Sprint 1_Launch'''
 
* '''Presentation: Sprint 1_Launch'''
 +
 
'''December 5'''
 
'''December 5'''
   Line 248: Line 250:  
* [https://github.com/gctools-outilsgc/design-system '''Github Repository''']
 
* [https://github.com/gctools-outilsgc/design-system '''Github Repository''']
 
* '''[https://www.gitbook.com/book/s-duffey/-gcdigital-design-system/details Gitbook for documentation]'''
 
* '''[https://www.gitbook.com/book/s-duffey/-gcdigital-design-system/details Gitbook for documentation]'''
* [https://github.com/cds-snc/gcui CDS GC UI]
   
* [https://zube.io/tbs-sct/design-system/w/main-workspace/kanban '''Design System Zube board''']
 
* [https://zube.io/tbs-sct/design-system/w/main-workspace/kanban '''Design System Zube board''']
   Line 268: Line 269:     
=== Phase I ===
 
=== Phase I ===
* Visual Language (colour, typography, iconography, motion)
+
==== Sections Completed ====
* UI Elements (buttons, form controls, text)
+
* Base Elements (Jan 2 - Jan 24)
* UI Components (i.e. footers, headers, comments, navigation)
+
* [https://gctools-outilsgc.gitbook.io/-gcdigital-design-system/typography Visuals] (Jan 24 - Feb 7)
* UI Patterns (form structure)
+
* [https://gctools-outilsgc.gitbook.io/-gcdigital-design-system/images-and-media Content] (Feb 7 - Feb 21)
* Downloads/Resources (Illustrator, Photoshop or Sketch files available for download)
+
* [https://gctools-outilsgc.gitbook.io/-gcdigital-design-system/forms-overall-design-and-labels Forms] (Feb 21 - Mar 28)
==== Project Timeline ====
+
* [https://gctools-outilsgc.gitbook.io/-gcdigital-design-system/nav-breadcrumbs Navigation] (Mar 28 - April 11)
<figure-inline>[[File:DS Project Timeline.JPG|1152x1152px]]</figure-inline>
+
* [https://gctools-outilsgc.gitbook.io/-gcdigital-design-system/data-overview Data Visualizations] (April 11 - April 25)
 +
* [https://github.com/gctools-outilsgc/design-system/tree/master/user%20interface%20kit User Interface Kit] (April 25 - May 15)
    
==== Phase II ====
 
==== Phase II ====
150

edits

Navigation menu

GCwiki