Difference between revisions of "Renouvellement de Portage III Avis aux occupants du bâtiment"

From wiki
Jump to navigation Jump to search
Line 5: Line 5:
 
<!--French-->
 
<!--French-->
 
{| class="FCK__ShowTableBorders" style="border:white solid 1px; background-color:#551155" width="10%" align="center"
 
{| class="FCK__ShowTableBorders" style="border:white solid 1px; background-color:#551155" width="10%" align="center"
| style="padding-right: 5px; padding-left: 5px; padding-bottom: 10px; padding-top: 10px; text-align: center;" | [[Place_du_Portage_III_Asset_and_Workplace_Renewal_Project|<span style="color:#ffffff"> '''English'''</span>]]  
+
| style="padding-right: 5px; padding-left: 5px; padding-bottom: 10px; padding-top: 10px; text-align: center;" | [[Place_du_Portage_III_AWR_Notices_to_tenants/occupants|<span style="color:#ffffff"> '''English'''</span>]]  
 
|} <br>
 
|} <br>
  

Revision as of 20:15, 21 April 2022

PDP3 Welcome Page1.jpg


English


Aperçu du projet Phases du projet et étapes importantes Objectifs et avantages Avis aux occupants du bâtiment Renseignements supplémentaires

Notices to tenants/occupants


Tenants of PDP3 and adjacent buildings have been informed of construction work through operational notices issued by BGIS, with PSPC’s informal consent. Notices issued to date are provided below. This list will be updated regularly.

Titre (lien) Date Objectif
Palissade de construction April 6, 2022 The main objective of the construction hoarding activities is to create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project.
Étude de caractérisation environnementale des sols April 5, 2022 To help identify potential contaminants in the soil in and around the project area. Information gathered during this work will help describe the environmental quality of the soil.
Activités d’abattage d’arbres March 25, 2022 To facilitate additional site logistics requirements for the Construction Manager (CM) to enable construction related activities in preparation of the PDP3 AWR Project and to update the landscape and riverfront greenbelt in connection to the complex.
Palissade de construction February 22, 2022 To create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project.
Palissade de construction (locaux provisoires) February 17, 2022 To create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project.
Palissade de construction February 11, 2022 To create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project.
Activités d’abattage d’arbres (Zone boisée) February 9, 2022 To create an interim construction laydown area for the CM to enable construction related activities in preparation of the PDP3 AWR Project; and an opportunity to update the landscape and Riverfront Greenbelt connection to the complex.