|To complete Place du Portage III Asset and Workplace Renewal (PDP3 AWR) Project scheduled renovations.
 
|To complete Place du Portage III Asset and Workplace Renewal (PDP3 AWR) Project scheduled renovations.
|-
  −
|'''[https://wiki.gccollab.ca/images/2/2b/CN35_fermeture_temporaire_acc%C3%A8s_au_quai_de_chargement_PDC-Temporary_Closure_of_Access_Route_to_Place_du_Centre_Loading_Dock02N.2022.pdf Place du Centre: Temporary Closure of Access Route to Loading Dock]'''
  −
|November 4, 2022
  −
  −
|To allow space to park a 90-Ton crane and assist with the installation of overhead protection.
  −
|-
  −
|'''[https://wiki.gccollab.ca/images/a/aa/CN-40_Tower_B1_L3_Asbestos_Abatement..F.pdf Asbestos Abatement in Tower B1 (L3)]'''
  −
|October 31, 2022
  −
  −
|To prepare the site for a new set of doors and to allow a new passage to the freight elevator in Tower A.
  −
|-
  −
|'''[https://wiki.gccollab.ca/images/d/d0/CN-39_Construction_Hoarding_PDPIV_Mechanical_Room.Final.pdf Delineation and Hoarding Wall in Mechanical Room]'''
  −
|October 28, 2022
  −
  −
|To delineate the construction space required to install the shear wall for PDP III Tower C as part of the PDP3 AWR Project.
  −
|-
  −
|'''[https://wiki.gccollab.ca/images/7/77/CN-36_Domestic_Water_Service_Interruption_R3.pdf Temporary Disruption of Domestic Water Supply On Emergency Basis]'''
  −
|October 21, 2022
  −
  −
|The main objective of the domestic water shutdown is due to concerns over the integrity of the pipe, and is required to allow for the reinforcement of the primary city water feed to Tower C ahead of excavation. This request is based on the emergency basis to replace Isolation valve of the fire suppression system.
  −
|-
  −
|'''[https://wiki.gccollab.ca/images/4/46/Asbestos_Abatement_Tower_A.F1.E%26F.pdf Tower A: Asbestos Abatement in Swing Spaces for Critical Tenants' Operations (L15)]'''
  −
|October 19, 2022
  −
  −
|To prepare the interim space for Tower B occupants.
   
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/1/17/Installation_of_Tower_Crane_in_Construction_Area.f.pdf Erection of Tower Crane (TC-1) in the construction area between PDP3 and PDP4 (Woodlands area)]'''
 
|'''[https://wiki.gccollab.ca/images/1/17/Installation_of_Tower_Crane_in_Construction_Area.f.pdf Erection of Tower Crane (TC-1) in the construction area between PDP3 and PDP4 (Woodlands area)]'''