Changes

Jump to navigation Jump to search
Line 33: Line 33:  
!'''Release Date'''
 
!'''Release Date'''
 
!'''Purpose'''
 
!'''Purpose'''
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/0/02/CN58.1_Electrical_Shutdown_in_Sub-Sector_Garage_mod_R1.pdf Electrical Shutdown in Laurier-Taché Parking Garage (Maisonneuve Sector) (UPDATED)]'''
 +
|February 8, 2023
 +
 +
|To proceed with scheduled Tower C electrical maintenance.
 
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/5/5d/CN60_Notice_of_Tower_Crane_%28TC-2%29_Installatio_R1.pdf Notice of Tower Crane (TC-2) Installation]'''
 
|'''[https://wiki.gccollab.ca/images/5/5d/CN60_Notice_of_Tower_Crane_%28TC-2%29_Installatio_R1.pdf Notice of Tower Crane (TC-2) Installation]'''
Line 43: Line 48:  
   
 
   
 
|To demolish the existing pipe and reinstall a new underground sanitary and storm one in L03 (A0314) in Tower A.  
 
|To demolish the existing pipe and reinstall a new underground sanitary and storm one in L03 (A0314) in Tower A.  
|-
  −
|'''[https://wiki.gccollab.ca/images/f/fc/CN58_Electrical_Shutdown_in_Maisonneuve_Sub-Sector_Garage_CANCELLED_R1.pdf Electrical Shutdown in Laurier-Taché Parking Garage (Maisonneuve Sector) (CANCELED)]'''
  −
|February 1, 2023
  −
  −
|To proceed with scheduled Tower C electrical maintenance.
   
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/e/eb/CN38.2_Structural_Steel_Upgrades_in_Laurier-Tach%C3%A9_Parking_Garage.F2.pdf Tower Crane 2 (TC-2): Structural Steel Upgrades (UPDATED)]'''
 
|'''[https://wiki.gccollab.ca/images/e/eb/CN38.2_Structural_Steel_Upgrades_in_Laurier-Tach%C3%A9_Parking_Garage.F2.pdf Tower Crane 2 (TC-2): Structural Steel Upgrades (UPDATED)]'''

Navigation menu

GCwiki