Line 33: Line 33:  
!'''Release Date'''
 
!'''Release Date'''
 
!'''Purpose'''
 
!'''Purpose'''
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/9/91/CN17.1_Mission_Critical_Spaces_Tower_A-F1.pdf Mission Critical Spaces (L15)]'''
 +
|January 27, 2023
 +
 +
|To complete A1 and A2 Towers construction fit up, to accommodate B1 Tower tenants.
 
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/1/1b/CN58_Electrical_Shutdown_in_Sub-Sector_Garage.F.REVIEWED.pdf Electrical Shutdown in Laurier-Taché Parking Garage (Maisonneuve Sector) (UPDATED)]'''
 
|'''[https://wiki.gccollab.ca/images/1/1b/CN58_Electrical_Shutdown_in_Sub-Sector_Garage.F.REVIEWED.pdf Electrical Shutdown in Laurier-Taché Parking Garage (Maisonneuve Sector) (UPDATED)]'''
Line 189: Line 194:  
   
 
   
 
|To facilitate the additional site logistics required for the Construction Manager (CM) to isolate the access to egress for site deliveries, loading and unloading. The implementation of this measure is also to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
 
|To facilitate the additional site logistics required for the Construction Manager (CM) to isolate the access to egress for site deliveries, loading and unloading. The implementation of this measure is also to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
|-
  −
|'''[https://wiki.gccollab.ca/images/d/d1/GOC479411-PDP_3_AWR-Critical_Spaces.F.pdf Mission Critical Spaces]'''
  −
|August 2, 2022
  −
  −
|To complete A1 and A2 Towers construction fit up, to accommodate B1 Tower tenants.
   
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/d/dd/GOC479411_PDP_3_AWR_-_PDP_IV_Wayfinding.pdf Place du Portage IV: Wayfinding]'''
 
|'''[https://wiki.gccollab.ca/images/d/dd/GOC479411_PDP_3_AWR_-_PDP_IV_Wayfinding.pdf Place du Portage IV: Wayfinding]'''