Changes

Jump to navigation Jump to search
Line 33: Line 33:  
!'''Release Date'''
 
!'''Release Date'''
 
!'''Purpose'''
 
!'''Purpose'''
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/1/1b/CN58_Electrical_Shutdown_in_Sub-Sector_Garage.F.REVIEWED.pdf Electrical Shutdown in Laurier-Taché Parking Garage (Maisonneuve Sector) (UPDATED)]'''
 +
|January 25, 2023
 +
 +
|To proceed with scheduled Tower C electrical maintenance.
 
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/c/cf/CN59_Tower_B3_Delineation_and_Hoarding_Wall.F2.pdf Tower B3: Delineation and Hoarding Wall (L0)]'''
 
|'''[https://wiki.gccollab.ca/images/c/cf/CN59_Tower_B3_Delineation_and_Hoarding_Wall.F2.pdf Tower B3: Delineation and Hoarding Wall (L0)]'''
Line 43: Line 48:  
   
 
   
 
|To outline and separate the occupied space from the demolition and abatement activities.  
 
|To outline and separate the occupied space from the demolition and abatement activities.  
|-
  −
|'''[https://wiki.gccollab.ca/images/b/bf/CN58_High_Voltage_Shutdown_in_VIP_Garage.F.pdf High Voltage Electrical Shutdown in Laurier-Taché Parking Garage (Maisonneuve Sector)]'''
  −
|January 19, 2023
  −
  −
|To relocate the High Voltage conductors around the area where the new shear wall in the VIP garage is being built.
   
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/f/f6/CN29.2_Tower_Crane_Installation_Laurier-Tach%C3%A9_Parking_Garage.F2.pdf Tower Crane Installation in Laurier-Taché Parking Garage (UPDATED)]'''
 
|'''[https://wiki.gccollab.ca/images/f/f6/CN29.2_Tower_Crane_Installation_Laurier-Tach%C3%A9_Parking_Garage.F2.pdf Tower Crane Installation in Laurier-Taché Parking Garage (UPDATED)]'''

Navigation menu

GCwiki