Changes

Line 229: Line 229:  
   
 
   
 
|To facilitate the additional site logistics required for the Construction Manager (CM) to isolate the access to egress for site deliveries, loading and unloading. The implementation of this measure is to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
 
|To facilitate the additional site logistics required for the Construction Manager (CM) to isolate the access to egress for site deliveries, loading and unloading. The implementation of this measure is to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
|-
  −
|'''[https://wiki.gccollab.ca/images/1/13/1-_Tower_A_and_B_Delineation_Hoarding.pdf Tower A and B Delineation Hoarding]'''
  −
|July 14, 2022
  −
  −
|Outline and separate the occupied space in Tower A2 from the construction activities in Tower B1.
   
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/6/61/GOC479411-_PDP_3_AWR-_CM-_Avis_-_Maisonneuve.pdf Sidewalk and Lane Closure on Maisonneuve Boulevard]'''
 
|'''[https://wiki.gccollab.ca/images/6/61/GOC479411-_PDP_3_AWR-_CM-_Avis_-_Maisonneuve.pdf Sidewalk and Lane Closure on Maisonneuve Boulevard]'''