Changes

Jump to navigation Jump to search
Line 234: Line 234:  
   
 
   
 
|Outline and separate the occupied space in Tower A2 from the construction activities in Tower B1.
 
|Outline and separate the occupied space in Tower A2 from the construction activities in Tower B1.
|-
  −
|'''[https://wiki.gccollab.ca/images/c/c5/2-Interim_Mailroom_Demolition_and_Abatement.pdf Interim Mailroom Demolition and Abatement]'''
  −
|July 14, 2022
  −
  −
|See notice
  −
|-
  −
|'''[https://wiki.gccollab.ca/images/3/3f/GOC479411-_PDP_3_AWR-_Construction_de_la_salle_de_courrier_provisoire.Bgis.pdf Interim Mailroom Construction]'''
  −
|June 20, 2022
  −
  −
|See notice.
   
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/6/61/GOC479411-_PDP_3_AWR-_CM-_Avis_-_Maisonneuve.pdf Sidewalk and Lane Closure on Maisonneuve Boulevard]'''
 
|'''[https://wiki.gccollab.ca/images/6/61/GOC479411-_PDP_3_AWR-_CM-_Avis_-_Maisonneuve.pdf Sidewalk and Lane Closure on Maisonneuve Boulevard]'''

Navigation menu

GCwiki