Line 43: Line 43:  
   
 
   
 
|To facilitate the additional site logistics required for the Construction Manager (CM) to isolate the access to egress for site deliveries, loading and unloading. The implementation of this measure is to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
 
|To facilitate the additional site logistics required for the Construction Manager (CM) to isolate the access to egress for site deliveries, loading and unloading. The implementation of this measure is to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
|-
  −
|'''[https://wiki.gccollab.ca/images/2/22/Laurier-Tache_Parking_Garage_Closure-Maisonneuve.Final.pdf Temporary Partial Closure: Laurier-Taché Parking Garage]'''
  −
|July 29, 2022
  −
  −
|To facilitate the following renovations: installation of a new elevator pit; an interruption in the ventilation system; structural upgrades; and replacement of underground piping.
   
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/d/d2/GOC479411-PDP_3_AWR-Place_de_Portage_IV_Bike_Storage.Final.pdf Relocation of the bicycle storage shelter at Tower C2 entrance hall at Level 02]'''
 
|'''[https://wiki.gccollab.ca/images/d/d2/GOC479411-PDP_3_AWR-Place_de_Portage_IV_Bike_Storage.Final.pdf Relocation of the bicycle storage shelter at Tower C2 entrance hall at Level 02]'''