Changes

no edit summary
Line 33: Line 33:  
<div style="padding:10px; font-size:120%; line-height: 1.5em;">
 
<div style="padding:10px; font-size:120%; line-height: 1.5em;">
    +
The Government of Canada (GoC) is investing in key strategic assets, including in Place du Portage III (PDP3), to provide federal public servants with workplaces that are modern, sustainable, healthy, safe, accessible and collaborative.
 +
<br>
 
The Place du Portage complex was built in the 1970s. As part of planned midlife renewal work, we are doing much-needed renovations, and replacing systems that have reached the end of their useful life. In fact, this project consists of a complete overhaul of both the inside and outside of the building which includes: <br>  
 
The Place du Portage complex was built in the 1970s. As part of planned midlife renewal work, we are doing much-needed renovations, and replacing systems that have reached the end of their useful life. In fact, this project consists of a complete overhaul of both the inside and outside of the building which includes: <br>  
 
+
<br>
 
• 9 towers <br>
 
• 9 towers <br>
 
• commercial areas<br>
 
• commercial areas<br>
Line 40: Line 42:  
• a 3-level underground parking garage  <br>
 
• a 3-level underground parking garage  <br>
 
<br>
 
<br>
  −
<br><br>
  −
The Government of Canada (GoC) is investing in key strategic assets, including in PDP3, to provide federal public servants with workplaces that are modern, sustainable, healthy, safe, accessible and collaborative.
  −
<br><br>
   
The project considers GoC priorities, including: <br>  
 
The project considers GoC priorities, including: <br>  
  
238

edits