Line 33: |
Line 33: |
| <div style="padding:10px; font-size:120%; line-height: 1.5em;"> | | <div style="padding:10px; font-size:120%; line-height: 1.5em;"> |
| | | |
− | The Place du Portage complex was built in the 1970s. This project consists of a complete overhaul of both the inside and outside of the building which consists of: <br> | + | The Place du Portage complex was built in the 1970s. As part of planned midlife renewal work, we are doing much-needed renovations, and replacing systems that have reached the end of their useful life. In fact, this project consists of a complete overhaul of both the inside and outside of the building which includes: <br> |
| | | |
| • 9 towers <br> | | • 9 towers <br> |
Line 40: |
Line 40: |
| • a 3-level underground parking garage <br> | | • a 3-level underground parking garage <br> |
| <br> | | <br> |
− | As part of planned midlife renewal work, we are doing much-needed renovations, and replacing systems that have reached the end of their useful life.
| + | |
| <br><br> | | <br><br> |
| The Government of Canada (GoC) is investing in key strategic assets, including in PDP3, to provide federal public servants with workplaces that are modern, sustainable, healthy, safe, accessible and collaborative. | | The Government of Canada (GoC) is investing in key strategic assets, including in PDP3, to provide federal public servants with workplaces that are modern, sustainable, healthy, safe, accessible and collaborative. |
| <br><br> | | <br><br> |
− | The PDP3 project considers Government of Canada (GC) priorities, including: <br> | + | The project considers GoC priorities, including: <br> |
| | | |
| • greening <br> | | • greening <br> |
Line 52: |
Line 52: |
| • wellness <br> | | • wellness <br> |
| <br> | | <br> |
− | The renewed PDP3 building is being designed to meet the modern workplace standard for the GC known as [https://www.tpsgc-pwgsc.gc.ca/biens-property/mt-wp/mt-wp-eng.html GCworkplace] which offers greater flexibility in where and how people work and suits the needs of a post-pandemic, hybrid workforce. | + | The renewed PDP3 building is being designed to meet the modern workplace standard for the GoC known as [https://www.tpsgc-pwgsc.gc.ca/biens-property/mt-wp/mt-wp-eng.html GCworkplace] which offers greater flexibility in where and how people work and suits the needs of a post-pandemic, hybrid workforce. |
| <br><br> | | <br><br> |
| <u><small>[[Place_du_Portage_III_Asset_and_Workplace_Renewal_Project| <i>Back to Welcome Page</I>]]</small></u><br> | | <u><small>[[Place_du_Portage_III_Asset_and_Workplace_Renewal_Project| <i>Back to Welcome Page</I>]]</small></u><br> |