Title (link)
|
Release Date
|
Purpose
|
---|
Sidewalk and Lane Closure on Maisonneuve Boulevard
|
May 24, 2022
|
To facilitate the additional site logistics required for the CM and to isolate the access to egress for site deliveries, loading and unloading. Additionally, the measures are required to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
|
Construction Hoarding: Tower C - North Courtyard
|
|
To facilitate the additional site logistics required for the Construction Manager and to isolate the access to egress for site deliveries, loading and unloading. Additionally, the measures are required to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
|
Construction Hoarding: Tower B - Exterior
|
|
To facilitate the additional site logistics required for the Construction Manager and to isolate the access to egress for site deliveries, loading and unloading. Additionally, the measures are required to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
|
Construction hoarding activities
|
April 6, 2022
|
The main objective of the construction hoarding activities is to create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project.
|
Environmental Soil Study Characterization
|
April 5, 2022
|
To help identify potential contaminants in the soil in and around the project area. Information gathered during this work will help describe the environmental quality of the soil.
|
Tree Removal Activities
|
March 25, 2022
|
To facilitate additional site logistics requirements for the Construction Manager (CM) to enable construction related activities in preparation of the PDP3 AWR Project and to update the landscape and riverfront greenbelt in connection to the complex.
|
Construction hoarding activities (Interim space)
|
February 22, 2022
|
To create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project.
|
Construction hoarding (CM site)
|
February 17, 2022
|
To create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project.
|
Construction hoarding
|
February 11, 2022
|
To create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project.
|
Tree removal activities (Woodland Area)
|
February 9, 2022
|
To create an interim construction laydown area for the CM to enable construction related activities in preparation of the PDP3 AWR Project; and an opportunity to update the landscape and Riverfront Greenbelt connection to the complex.
|