Titre (lien)
|
Date
|
Objectif
|
---|
Palissade de construction
|
6 avril 2022
|
The main objective of the construction hoarding activities is to create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project.
|
Étude de caractérisation environnementale des sols
|
5 avril 2022
|
To help identify potential contaminants in the soil in and around the project area. Information gathered during this work will help describe the environmental quality of the soil.
|
Activités d’abattage d’arbres
|
25 mars 2022
|
To facilitate additional site logistics requirements for the Construction Manager (CM) to enable construction related activities in preparation of the PDP3 AWR Project and to update the landscape and riverfront greenbelt in connection to the complex.
|
Palissade de construction (locaux provisoires)
|
22 février 2022
|
To create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project.
|
Palissade de construction (Bureau de site du directeur des travaux)
|
17 février 2022
|
To create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project.
|
Palissade de construction
|
11 février 2022
|
To create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project.
|
Activités d’abattage d’arbres (Zone boisée)
|
9 février 2022
|
To create an interim construction laydown area for the CM to enable construction related activities in preparation of the PDP3 AWR Project; and an opportunity to update the landscape and Riverfront Greenbelt connection to the complex.
|