Changes

no edit summary
Line 26: Line 26:  
*List was slightly better than picker
 
*List was slightly better than picker
 
*Next steps: Travel page already live (Jan 29), and hope travel feedback volume will decrease
 
*Next steps: Travel page already live (Jan 29), and hope travel feedback volume will decrease
:*Going to break out the Vaccines roll-out page into two (proto in progress)
+
:*Going to break out the Vaccines roll-out page into two (prototype in progress)
 
:*Develop picker design patter with advice to use for long list or > 6 links  
 
:*Develop picker design patter with advice to use for long list or > 6 links  
   Line 38: Line 38:     
==Discussion item: Who has or is building a design system?==
 
==Discussion item: Who has or is building a design system?==
Long term planning: DTO manages guidance/templates for the Canda.ca design system
+
*Long term planning: DTO manages guidance/templates for the Canda.ca design system
    
==Notes and action items==
 
==Notes and action items==
1,123

edits