Difference between revisions of "File:PMR BOP Integration savings.xlsx"
Jump to navigation
Jump to search
(A comparative study of the possible savings of integration of PMR planning, PMR-BOP data and data gathering methods. A side-by-side comparison of As-Is vs. To-Be scenarios) |
(No difference)
|
Latest revision as of 23:21, 25 March 2020
Summary
A comparative study of the possible savings of integration of PMR planning, PMR-BOP data and data gathering methods. A side-by-side comparison of As-Is vs. To-Be scenarios
File history
Click on a date/time to view the file as it appeared at that time.
Date/Time | Dimensions | User | Comment | |
---|---|---|---|---|
current | 23:21, 25 March 2020 | (67 KB) | William.taylor (talk | contribs) | A comparative study of the possible savings of integration of PMR planning, PMR-BOP data and data gathering methods. A side-by-side comparison of As-Is vs. To-Be scenarios |
You cannot overwrite this file.
File usage
There are no pages that use this file.