Changes

Jump to navigation Jump to search
1 byte added ,  10:00, 10 February 2023
Can we add stuff?
Line 26: Line 26:  
https://www.defenseindustrydaily.com/canada-holland-order-17-sirius-shipboard-longrange-irst-sensors-updated-02183/ building iteratively with many prototypes/proof of concepts, with key SMEs in the loop and a good baseline of requirements (from defense research), with good  
 
https://www.defenseindustrydaily.com/canada-holland-order-17-sirius-shipboard-longrange-irst-sensors-updated-02183/ building iteratively with many prototypes/proof of concepts, with key SMEs in the loop and a good baseline of requirements (from defense research), with good  
 
people, tools, process (achieved CMMI level 5) with direction, commitment, goals, small builds
 
people, tools, process (achieved CMMI level 5) with direction, commitment, goals, small builds
 +
 
Projects that were a complete failure (I didn't stay on these messy projects):
 
Projects that were a complete failure (I didn't stay on these messy projects):
 
lacked a baseline of operational requirements (client’s needs)  
 
lacked a baseline of operational requirements (client’s needs)  
97

edits

Navigation menu

GCwiki