Line 39: Line 39:  
|To facilitate construction renovations. Reasons for the partial closure include: the installation of a new elevator pit; an interruption in the ventilation system; structural upgrades, and replacement of underground piping.
 
|To facilitate construction renovations. Reasons for the partial closure include: the installation of a new elevator pit; an interruption in the ventilation system; structural upgrades, and replacement of underground piping.
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/1/13/1-_Tower_A_and_B_Delineation_Hoarding.pdf Relocation of the bicycle storage shelter at Tower C2 entrance hall at Level 02]'''
+
|'''[https://wiki.gccollab.ca/images/5/5b/GOC479411-PDP_3_AWR-CM-Place_de_Portage_IV_Bike_Storage.Final.pdf Relocation of the bicycle storage shelter at Tower C2 entrance hall at Level 02]'''
 
|July 26, 2022  
 
|July 26, 2022  
 
   
 
   