Changes

Jump to navigation Jump to search
Line 44: Line 44:  
|To facilitate the additional site logistics required for the Construction Manager and to isolate the access to egress for site deliveries, loading and unloading. Additionally, the measures are required to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
 
|To facilitate the additional site logistics required for the Construction Manager and to isolate the access to egress for site deliveries, loading and unloading. Additionally, the measures are required to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/d/d7/1-_Construction_hoarding_activities.pdf Construction Hoarding: Tower B - Exterior]'''
+
|'''[https://wiki.gccollab.ca/images/5/5c/GOC479411-_PDP_3_AWR-_CM-Tower_B_Construction_Hoarding_Communications_Notice.Final.pdf Construction Hoarding: Tower B - Exterior]'''
 
|
 
|
 
   
 
   
238

edits

Navigation menu

GCwiki