Changes

Jump to navigation Jump to search
no edit summary
Line 4: Line 4:     
===What is Activity-Based Working?===
 
===What is Activity-Based Working?===
Activity-Based Working (ABW) is a design concept that recognizes that through the course of any day, employees engage in many different activities and that they need and can choose different types of work settings to accommodate these activities. It is combined with a non-assigned seating model.
+
Activity-Based Working (ABW) is a design concept that recognizes that through the course of any day, employees engage in many different activities and that they need and can choose different workplace settings to support these activities. It’s a modern way to work that uses the technology to allow more flexibility and works in conjunction with a shared seating model.
 +
 
 +
== The 3 dimensions of ABW: People, Technology and Space ==
 +
<br>
 +
[[File:3_dimensions.png|alt=|frameless|941x941px]]
 +
 
 +
 
 +
==These interdependent elements come together in the vision for ESDC Workplace: ==
 +
<br>
 +
[[File:3_dimensions_2.png|alt=|frameless|1138x1138px]]
 +
 
    
{| width="100%" cellpadding="20" cellspacing="15px"
 
{| width="100%" cellpadding="20" cellspacing="15px"
Line 46: Line 56:  
|[[File:Meetingroom.png|alt=Collaborative spaces|center|frameless]]
 
|[[File:Meetingroom.png|alt=Collaborative spaces|center|frameless]]
 
|}
 
|}
  −
== The 3 dimensions of ABW: People, Technology and Space ==
  −
<br>
  −
[[File:3_dimensions.png|alt=|frameless|941x941px]]
  −
<br>
  −
==Discover these 3 interdependent elements from the ESDC Workplace vision==
  −
<br>
  −
[[File:3_dimensions_2.png|alt=|frameless|1138x1138px]]
 

Navigation menu

GCwiki