Changes

Jump to navigation Jump to search
m
no edit summary
Line 8: Line 8:     
The <b>GC BCM</b> is a view of the whole Government of Canada as one large organization. Thus, one department's specific capability may be part of the bigger core capabilities of the GC BCM (mostly Section 6).
 
The <b>GC BCM</b> is a view of the whole Government of Canada as one large organization. Thus, one department's specific capability may be part of the bigger core capabilities of the GC BCM (mostly Section 6).
 +
</br>
 +
[[File:GC BCM v2.0.jpg|center|thumb|GC BCM 2.0 Model|upright=3.5]]
 
</br>
 
</br>
 
Here are some <u>benefits</u> of business capabilities:
 
Here are some <u>benefits</u> of business capabilities:
Line 18: Line 20:  
Since the GC BCM is of higher level (Level 0 & Level 1), departments is expected to use the GC BCM as a baseline to build their departmental BCM by building deeper into Level 2, 3, and so on.  
 
Since the GC BCM is of higher level (Level 0 & Level 1), departments is expected to use the GC BCM as a baseline to build their departmental BCM by building deeper into Level 2, 3, and so on.  
 
</br></br>
 
</br></br>
 +
 
The tables below reflect the [https://gcconnex.gc.ca/file/view/50303099/gcbcm-gcmca-v2-visualmodel-20190617-en-pdf?language=en GC BCM 2.0 Model] with proposed updates for the future version (that are flagged and considered under construction). A request to GC EARB will be made to endorse the formal adoption of updates to the model.
 
The tables below reflect the [https://gcconnex.gc.ca/file/view/50303099/gcbcm-gcmca-v2-visualmodel-20190617-en-pdf?language=en GC BCM 2.0 Model] with proposed updates for the future version (that are flagged and considered under construction). A request to GC EARB will be made to endorse the formal adoption of updates to the model.
  −
[[File:GC BCM v2.0.jpg|center|thumb|GC BCM 2.0 Model|upright=3.5]]
      
<!-- Table start -->
 
<!-- Table start -->
514

edits

Navigation menu

GCwiki