Line 2: Line 2:  
'''Use this document as guidance to help complete SSC Appendix 3 slides'''
 
'''Use this document as guidance to help complete SSC Appendix 3 slides'''
 
<br>
 
<br>
 
+
<br>
 
'''Security Profile, Availability, and Disaster Recovery Information:'''
 
'''Security Profile, Availability, and Disaster Recovery Information:'''
<br>
   
<br>
 
<br>
 
'''Security Profile:''' Provide the security profile for the solution (eg. PBMM, PBHM, etc). If the solution includes multiple components with different security profiles, include all security profiles.
 
'''Security Profile:''' Provide the security profile for the solution (eg. PBMM, PBHM, etc). If the solution includes multiple components with different security profiles, include all security profiles.
<br>
   
<br>
 
<br>
 
'''Maximum Allowable Unplanned downtime:''' provide expected maximum allowable downtime in hours per year if system is expected to run 24/7, or general availability hours if the system is expected to run during business hours and have downtime otherwise.
 
'''Maximum Allowable Unplanned downtime:''' provide expected maximum allowable downtime in hours per year if system is expected to run 24/7, or general availability hours if the system is expected to run during business hours and have downtime otherwise.
<br>
   
<br>
 
<br>
 
'''Availability requirements:''' Provide an estimate for availability requirements: Medium availability is 95%, High availability is >=99%
 
'''Availability requirements:''' Provide an estimate for availability requirements: Medium availability is 95%, High availability is >=99%
<br>
   
<br>
 
<br>
 
'''Disaster Recovery:''' select expected disaster recovery needs
 
'''Disaster Recovery:''' select expected disaster recovery needs
<br>
   
<br>
 
<br>
 
:• Hot Site: Facility and equipment are set up and ready to go, with either synchronous or asynchronous data replication. It is available and running 24/7.
 
:• Hot Site: Facility and equipment are set up and ready to go, with either synchronous or asynchronous data replication. It is available and running 24/7.
Line 22: Line 17:  
:• Cold Site: Available space/facility where you need to set up the equipment, connectivity, load the software and data.
 
:• Cold Site: Available space/facility where you need to set up the equipment, connectivity, load the software and data.
 
:• None: best effort disaster recovery.
 
:• None: best effort disaster recovery.
<br>
   
<br>
 
<br>
 
'''Authentication:''' select the authentication method from the options below. DCAM, ICM/ECM, or Sign in Canada are the preferred methods:
 
'''Authentication:''' select the authentication method from the options below. DCAM, ICM/ECM, or Sign in Canada are the preferred methods:
<br>
   
<br>
 
<br>
 
:• DCAM (Active Directory solution using ADFS)
 
:• DCAM (Active Directory solution using ADFS)
Line 31: Line 24:  
:• Sign in Canada  
 
:• Sign in Canada  
 
:• Other: Specify the authentication method if none of the above are being used.  
 
:• Other: Specify the authentication method if none of the above are being used.  
<br>
   
<br>
 
<br>
 
'''Hosting Solution:''' Specify all hosting options:
 
'''Hosting Solution:''' Specify all hosting options:
<br>
   
<br>
 
<br>
 
:o End State Data Centre (specify EDC)
 
:o End State Data Centre (specify EDC)
 
:o Legacy Data Centre (specify specific data centre)
 
:o Legacy Data Centre (specify specific data centre)
 
:o Cloud – specify cloud solution
 
:o Cloud – specify cloud solution
<br>
   
<br>
 
<br>
 
'''Workload Migration:''' Is any workload migrating out of legacy data centres: Yes/No
 
'''Workload Migration:''' Is any workload migrating out of legacy data centres: Yes/No
<br>
   
<br>
 
<br>
 
'''Network Details:'''
 
'''Network Details:'''
<br>
   
<br>
 
<br>
 
:• '''Network Connectivity:''' Specify the network(s) the solution will use: eg. GCNet, Science Net, GCSI, etc.
 
:• '''Network Connectivity:''' Specify the network(s) the solution will use: eg. GCNet, Science Net, GCSI, etc.
Line 65: Line 53:  
:o Interactive (APIs)
 
:o Interactive (APIs)
 
Cloud Details:
 
Cloud Details:
<br>
+
:• List the solution’s relevant Cloud Usage Profiles
• List the solution’s relevant Cloud Usage Profiles
+
:• List the solution’s relevant Cloud Connection Patterns
• List the solution’s relevant Cloud Connection Patterns
+
:• Is SCED Needed? Yes/No
• Is SCED Needed? Yes/No
+
:• Has the department been prioritized? If Yes, on which architecture?
• Has the department been prioritized? If Yes, on which architecture?
 