Line 2: |
Line 2: |
| '''Use this document as guidance to help complete SSC Appendix 3 slides''' | | '''Use this document as guidance to help complete SSC Appendix 3 slides''' |
| <br> | | <br> |
− | | + | <br> |
| '''Security Profile, Availability, and Disaster Recovery Information:''' | | '''Security Profile, Availability, and Disaster Recovery Information:''' |
− | <br>
| |
| <br> | | <br> |
| '''Security Profile:''' Provide the security profile for the solution (eg. PBMM, PBHM, etc). If the solution includes multiple components with different security profiles, include all security profiles. | | '''Security Profile:''' Provide the security profile for the solution (eg. PBMM, PBHM, etc). If the solution includes multiple components with different security profiles, include all security profiles. |
− | <br>
| |
| <br> | | <br> |
| '''Maximum Allowable Unplanned downtime:''' provide expected maximum allowable downtime in hours per year if system is expected to run 24/7, or general availability hours if the system is expected to run during business hours and have downtime otherwise. | | '''Maximum Allowable Unplanned downtime:''' provide expected maximum allowable downtime in hours per year if system is expected to run 24/7, or general availability hours if the system is expected to run during business hours and have downtime otherwise. |
− | <br>
| |
| <br> | | <br> |
| '''Availability requirements:''' Provide an estimate for availability requirements: Medium availability is 95%, High availability is >=99% | | '''Availability requirements:''' Provide an estimate for availability requirements: Medium availability is 95%, High availability is >=99% |
− | <br>
| |
| <br> | | <br> |
| '''Disaster Recovery:''' select expected disaster recovery needs | | '''Disaster Recovery:''' select expected disaster recovery needs |
− | <br>
| |
| <br> | | <br> |
| :• Hot Site: Facility and equipment are set up and ready to go, with either synchronous or asynchronous data replication. It is available and running 24/7. | | :• Hot Site: Facility and equipment are set up and ready to go, with either synchronous or asynchronous data replication. It is available and running 24/7. |
Line 22: |
Line 17: |
| :• Cold Site: Available space/facility where you need to set up the equipment, connectivity, load the software and data. | | :• Cold Site: Available space/facility where you need to set up the equipment, connectivity, load the software and data. |
| :• None: best effort disaster recovery. | | :• None: best effort disaster recovery. |
− | <br>
| |
| <br> | | <br> |
| '''Authentication:''' select the authentication method from the options below. DCAM, ICM/ECM, or Sign in Canada are the preferred methods: | | '''Authentication:''' select the authentication method from the options below. DCAM, ICM/ECM, or Sign in Canada are the preferred methods: |
− | <br>
| |
| <br> | | <br> |
| :• DCAM (Active Directory solution using ADFS) | | :• DCAM (Active Directory solution using ADFS) |
Line 31: |
Line 24: |
| :• Sign in Canada | | :• Sign in Canada |
| :• Other: Specify the authentication method if none of the above are being used. | | :• Other: Specify the authentication method if none of the above are being used. |
− | <br>
| |
| <br> | | <br> |
| '''Hosting Solution:''' Specify all hosting options: | | '''Hosting Solution:''' Specify all hosting options: |
− | <br>
| |
| <br> | | <br> |
| :o End State Data Centre (specify EDC) | | :o End State Data Centre (specify EDC) |
| :o Legacy Data Centre (specify specific data centre) | | :o Legacy Data Centre (specify specific data centre) |
| :o Cloud – specify cloud solution | | :o Cloud – specify cloud solution |
− | <br>
| |
| <br> | | <br> |
| '''Workload Migration:''' Is any workload migrating out of legacy data centres: Yes/No | | '''Workload Migration:''' Is any workload migrating out of legacy data centres: Yes/No |
− | <br>
| |
| <br> | | <br> |
| '''Network Details:''' | | '''Network Details:''' |
− | <br>
| |
| <br> | | <br> |
| :• '''Network Connectivity:''' Specify the network(s) the solution will use: eg. GCNet, Science Net, GCSI, etc. | | :• '''Network Connectivity:''' Specify the network(s) the solution will use: eg. GCNet, Science Net, GCSI, etc. |
Line 65: |
Line 53: |
| :o Interactive (APIs) | | :o Interactive (APIs) |
| Cloud Details: | | Cloud Details: |
− | <br>
| + | :• List the solution’s relevant Cloud Usage Profiles |
− | • List the solution’s relevant Cloud Usage Profiles | + | :• List the solution’s relevant Cloud Connection Patterns |
− | • List the solution’s relevant Cloud Connection Patterns | + | :• Is SCED Needed? Yes/No |
− | • Is SCED Needed? Yes/No | + | :• Has the department been prioritized? If Yes, on which architecture? |
− | • Has the department been prioritized? If Yes, on which architecture? | |