Changes

Jump to navigation Jump to search
no edit summary
Line 1: Line 1:  
Security Profile, Availability, and Disaster Recovery Information:
 
Security Profile, Availability, and Disaster Recovery Information:
 +
<br>
 +
<br>
 
Security Profile: Provide the security profile for the solution (eg. PBMM, PBHM, etc). If the solution includes multiple components with different security profiles, include all security profiles.
 
Security Profile: Provide the security profile for the solution (eg. PBMM, PBHM, etc). If the solution includes multiple components with different security profiles, include all security profiles.
 +
<br>
 +
<br>
 
Maximum Allowable Unplanned downtime: provide expected maximum allowable downtime in hours per year if system is expected to run 24/7, or general availability hours if the system is expected to run during business hours and have downtime otherwise.
 
Maximum Allowable Unplanned downtime: provide expected maximum allowable downtime in hours per year if system is expected to run 24/7, or general availability hours if the system is expected to run during business hours and have downtime otherwise.
 +
<br>
 +
<br>
 
Availability requirements: Provide an estimate for availability requirements: Medium availability is 95%, High availability is >=99%
 
Availability requirements: Provide an estimate for availability requirements: Medium availability is 95%, High availability is >=99%
 +
<br>
 +
<br>
 
Disaster Recovery: select expected disaster recovery needs
 
Disaster Recovery: select expected disaster recovery needs
 +
<br>
 +
<br>
 
• Hot Site: Facility and equipment are set up and ready to go, with either synchronous or asynchronous data replication. It is available and running 24/7.
 
• Hot Site: Facility and equipment are set up and ready to go, with either synchronous or asynchronous data replication. It is available and running 24/7.
 +
<br>
 
• Warm Site: Equipment is available and configured. Latest application data must loaded or restored.
 
• Warm Site: Equipment is available and configured. Latest application data must loaded or restored.
 +
<br>
 
• Cold Site: Available space/facility where you need to set up the equipment, connectivity, load the software and data.
 
• Cold Site: Available space/facility where you need to set up the equipment, connectivity, load the software and data.
 +
<br>
 
• None: best effort disaster recovery.
 
• None: best effort disaster recovery.
 +
<br>
 +
<br>
 
Authentication: select the authentication method from the options below. DCAM, ICM/ECM, or Sign in Canada are the preferred methods:
 
Authentication: select the authentication method from the options below. DCAM, ICM/ECM, or Sign in Canada are the preferred methods:
 +
<br>
 +
<br>
 
• DCAM (Active Directory solution using ADFS)
 
• DCAM (Active Directory solution using ADFS)
 +
<br>
 
• ICM/ECM – GCKey, MyKey
 
• ICM/ECM – GCKey, MyKey
 +
<br>
 
• Sign in Canada  
 
• Sign in Canada  
 +
<br>
 
• Other: Specify the authentication method if none of the above are being used.  
 
• Other: Specify the authentication method if none of the above are being used.  
 +
<br>
 +
<br>
 
Hosting Solution: Specify all hosting options:
 
Hosting Solution: Specify all hosting options:
 +
<br>
 +
<br>
 
o End State Data Centre (specify EDC)
 
o End State Data Centre (specify EDC)
 +
<br>
 
o Legacy Data Centre (specify specific data centre)
 
o Legacy Data Centre (specify specific data centre)
 +
<br>
 
o Cloud – specify cloud solution
 
o Cloud – specify cloud solution
 +
<br>
 +
<br>
 
Workload Migration: Is any workload migrating out of legacy data centres: Yes/No
 
Workload Migration: Is any workload migrating out of legacy data centres: Yes/No
 +
<br>
 +
<br>
 
Network Details:
 
Network Details:
 +
<br>
 +
<br>
 
• Network Connectivity: Specify the network(s) the solution will use: eg. GCNet, Science Net, GCSI, etc.
 
• Network Connectivity: Specify the network(s) the solution will use: eg. GCNet, Science Net, GCSI, etc.
 +
<br>
 
• Solution Sensitivity to Network Delay:
 
• Solution Sensitivity to Network Delay:

Navigation menu

GCwiki