Line 25: |
Line 25: |
| Upcoming maintenance releases will include increased usability such as enhanced search features, and performance improvements (through cloud integration). | | Upcoming maintenance releases will include increased usability such as enhanced search features, and performance improvements (through cloud integration). |
| | | |
− | If you’re an inspector and would like to provide feedback, you can <a href="https://docs.google.com/forms/d/e/1FAIpQLSdrMe4RB49sckATUMXjjKgZf4z7QrCB-EFMhLEs3pbgSw5FcQ/viewform?usp=sf_link">send us your comments</a> at any time or fill out our <a href="https://www.surveymonkey.ca/r/MTtc1019">Mobile Technology Survey</a>. | + | If you’re an inspector and would like to provide feedback, you can [https://docs.google.com/forms/d/e/1FAIpQLSdrMe4RB49sckATUMXjjKgZf4z7QrCB-EFMhLEs3pbgSw5FcQ/viewform?usp=sf_link send us your comments]at any time or fill out our [https://www.surveymonkey.ca/r/MTtc1019 Mobile Technology Survey]. |
| | | |
| | | |
| | | |
− | | + | <!-- |
| | | |
| <img src="https://www.gcpedia.gc.ca/gcwiki/images/9/9a/Mtco-banner.jpg" class="img-responsive" style="width:100%;" alt="Transport Canada"> | | <img src="https://www.gcpedia.gc.ca/gcwiki/images/9/9a/Mtco-banner.jpg" class="img-responsive" style="width:100%;" alt="Transport Canada"> |
Line 57: |
Line 57: |
| <iframe src="https://docs.google.com/forms/d/e/1FAIpQLSdrMe4RB49sckATUMXjjKgZf4z7QrCB-EFMhLEs3pbgSw5FcQ/viewform?embedded=true" width="400" height="300" frameborder="0" marginheight="0" marginwidth="0">Loading…</iframe> | | <iframe src="https://docs.google.com/forms/d/e/1FAIpQLSdrMe4RB49sckATUMXjjKgZf4z7QrCB-EFMhLEs3pbgSw5FcQ/viewform?embedded=true" width="400" height="300" frameborder="0" marginheight="0" marginwidth="0">Loading…</iframe> |
| | | |
− | | + | --> |
| | | |
| | | |
Line 80: |
Line 80: |
| We are currently working on adding two Rail Inspection processes to the Activity Centre, with the goal of adding inspection processes for all of Transport Canada’s modes. | | We are currently working on adding two Rail Inspection processes to the Activity Centre, with the goal of adding inspection processes for all of Transport Canada’s modes. |
| | | |
| + | <div style="width:100%; max-width:100%;> |
| + | <div style="float:left; width:45%;> |
| + | [[File:002 Marine Inspector 3x2.jpg]] |
| + | </div> |
| + | <div style="float:right; width:45%;> |
| + | =First we built something for everyone…= |
| | | |
− | <img src="https://www.gcpedia.gc.ca/gcwiki/images/f/f7/002_Marine_Inspector_3x2.jpg" class="img-fluid" alt="Placeholder image">
| + | All TC inspectors in all transport modes can now use the myTC Oversight Reference Centre to access the digital reference material necessary to complete their inspections. This replaces the need to carry legacy, paper copies of reference material, with material that is available all in one place on the platform, even when inspectors are disconnected from either the TC network or the internet. |
− | First we built something for everyone….
| |
| | | |
− | All TC inspectors in all transport modes can now use the myTC Oversight Reference Centre to access the digital reference material necessary to complete their inspections. This replaces the need to carry legacy, paper copies of reference material, with material that is available all in one place on the platform, even when inspectors are disconnected from either the TC network or the internet.
| + | </div> |
| | | |
| + | <div style="clear:both;></div> |
| | | |
− | Now we’re building everyone something… | + | <div style="float:left; width:45%;> |
| + | =Now we’re building everyone something…= |
| | | |
| Having built the platform, the myTC Oversight Team is now developing the Activity Centre by adding digital inspection processes so that inspectors can: | | Having built the platform, the myTC Oversight Team is now developing the Activity Centre by adding digital inspection processes so that inspectors can: |
| + | #conduct, complete and review inspections |
| + | #incorporate electronic signatures where required |
| + | #convert inspection data to PDFs and deliver them by email, or by printing if required.to carry legacy, paper copies of reference material, with material that is available all in one place on the platform, even when inspectors are disconnected from either the TC network or the internet. |
| + | </div> |
| + | <div style="float:right; width:45%;> |
| + | [[File:Mtco signature panelcrop-hand.jpg|700px]] |
| + | |
| + | </div> |
| + | |
| + | <div style="clear:both;></div> |
| + | |
| + | </div> |
| + | |
| + | |
| | | |
− | conduct, complete and review inspections
| |
− | incorporate electronic signatures where required
| |
− | convert inspection data to PDFs and deliver them by email, or by printing if required.
| |
| | | |
| <img src="https://www.gcpedia.gc.ca/gcwiki/images/b/bf/Mtco_signature_panelcrop-hand.jpg" class="img-fluid" alt="Placeholder image"> | | <img src="https://www.gcpedia.gc.ca/gcwiki/images/b/bf/Mtco_signature_panelcrop-hand.jpg" class="img-fluid" alt="Placeholder image"> |