Changes

no edit summary
Line 1: Line 1: −
<!--765e-->
+
'''<big>IMPORTANT: Please note that this site has been replaced by the new [https://www.gcpedia.gc.ca/wiki/PDP3AWR_Home PDP3 AWR Project Portal on GCpedia]; no further updates will be made.</big>'''<!--765e-->
 
[[Image:PDP3_Welcome_Page1.jpg|center|link=]]
 
[[Image:PDP3_Welcome_Page1.jpg|center|link=]]
 
<br>
 
<br>
Line 35: Line 35:  
The project is divided into two phases and consists of a complete overhaul of both the inside and outside of the building. <br>  
 
The project is divided into two phases and consists of a complete overhaul of both the inside and outside of the building. <br>  
 
<br>
 
<br>
<b>Phase 1</b> (from 2018 to 2024) is already underway. It will address the interior workplace refit of the western towers C1, C2, D and B3, and common base building systems throughout the complex.
+
<b>Phase 1</b> (from 2018 to 2027) is underway. It will address the interior workplace refit of the western towers (C1, C2, D and B3) by 2024, and common base building systems throughout the complex by 2027.
 
<br><br>
 
<br><br>
<b>Phase 2</b> (from 2022 to 2027) will address the interior workplace refit eastern towers A1, A2, B1, B2 and E.
+
<b>Phase 2</b> (from 2024 to 2027) will address the interior workplace refit eastern towers (A1, A2, B1, B2 and E).
 
<br><br>
 
<br><br>
 
<b>Key milestones</b><br>  
 
<b>Key milestones</b><br>