Changes

no edit summary
Line 33: Line 33:  
<div style="padding:10px; font-size:120%; line-height: 1.5em;">
 
<div style="padding:10px; font-size:120%; line-height: 1.5em;">
   −
The Government of Canada (GoC) is investing in key strategic assets, including in Place du Portage III (PDP3), to provide federal public servants with workplaces that are modern, sustainable, healthy, safe, accessible and collaborative.<br>
+
The Place du Portage complex was built in the 1970s and consists of: <br>  
<br>
  −
The Place du Portage complex was built in the 1970s. As part of planned midlife renewal work, we are doing much-needed renovations, and replacing systems that have reached the end of their useful life. In fact, this project consists of a complete overhaul of both the inside and outside of the building which includes: <br>  
   
<br>
 
<br>
 
• 9 towers <br>
 
• 9 towers <br>
Line 42: Line 40:  
• a 3-level underground parking garage  <br>
 
• a 3-level underground parking garage  <br>
 
<br>
 
<br>
 +
The PDP3 AWR project consists of a complete overhaul of both the inside and outside of the building. As part of the planned midlife renewal work, we are doing much-needed renovations and are replacing systems that have reached the end of their useful life. The project includes:
 +
 +
• replacing base building systems, such as:
 +
• windows
 +
• the building exterior (also known as the building envelope)
 +
• plumbing
 +
• electrical systems
 +
• heating and cooling systems
 +
• modernizing the interior workplace
 +
• updating security systems
 +
• installing new information technology<br>
 +
 
The project considers GoC priorities, including: <br>  
 
The project considers GoC priorities, including: <br>  
  
238

edits