Changes

Line 199: Line 199:  
   
 
   
 
|To facilitate the additional site logistics required for the Construction Manager (CM) to isolate the access to egress for site deliveries, loading and unloading. The implementation of this measure is also to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
 
|To facilitate the additional site logistics required for the Construction Manager (CM) to isolate the access to egress for site deliveries, loading and unloading. The implementation of this measure is also to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
|-
  −
|'''[https://wiki.gccollab.ca/images/a/ad/PDP_IV_Sign_Reinstatement_%28CN-14%29.F.pdf PDP IV: Sign replacement]'''
  −
|August 15, 2022
  −
  −
|To install the new PDP IV sign onto the exterior corner of the building, next to the Woodlands Area.
   
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/d/d1/GOC479411-PDP_3_AWR-Critical_Spaces.F.pdf Mission Critical Spaces]'''
 
|'''[https://wiki.gccollab.ca/images/d/d1/GOC479411-PDP_3_AWR-Critical_Spaces.F.pdf Mission Critical Spaces]'''