Changes

Line 259: Line 259:  
   
 
   
 
|To facilitate the additional site logistics required for the Construction Manager and to isolate the access to egress for site deliveries, loading and unloading. Additionally, the measures are required to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
 
|To facilitate the additional site logistics required for the Construction Manager and to isolate the access to egress for site deliveries, loading and unloading. Additionally, the measures are required to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
|-
  −
|'''[https://wiki.gccollab.ca/images/d/d7/1-_Construction_hoarding_activities.pdf Construction hoarding activities]'''
  −
|April 6, 2022
  −
  −
|The main objective of the construction hoarding activities is to create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project.
  −
|-
  −
|'''[https://wiki.gccollab.ca/images/2/2c/2-Environmental_Soil_Study_Characterization.pdf Environmental Soil Study Characterization]'''
  −
|April 5, 2022
  −
  −
|To help identify potential contaminants in the soil in and around the project area. Information gathered during this work will help describe the environmental quality of the soil.
   
|}
 
|}
 
<br>
 
<br>
 
<u><small>[[Place_du_Portage_III_Asset_and_Workplace_Renewal_Project| <i>Back to Welcome Page</I>]]</small></u><br>
 
<u><small>[[Place_du_Portage_III_Asset_and_Workplace_Renewal_Project| <i>Back to Welcome Page</I>]]</small></u><br>
 
</div>
 
</div>