'''<big>IMPORTANT: Please note that this site has been replaced by the new [https://www.gcpedia.gc.ca/wiki/PDP3AWR_Home PDP3 AWR Project Portal on GCpedia]; no further updates will be made.</big>'''<!--765e-->
 
[[Image:PDP3_Welcome_Page1.jpg|center|link=]]
 
[[Image:PDP3_Welcome_Page1.jpg|center|link=]]
 
<br>
 
<br>
Line 33: Line 33:  
!'''Release Date'''
 
!'''Release Date'''
 
!'''Purpose'''
 
!'''Purpose'''
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/7/75/CN65_-_Fermeture_De_L%27escalier_De_Secours_Ext%C3%A9rieur_-_Closure_Of_Exterior_Emergency_Exit_Staircase.pdf Temporary Closure of Exterior Emergency Staircase]'''
 +
|March 16, 2023
 +
 +
|To allow for investigations and repairs to the compromised structural slab in Tower A (L03).
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/0/02/CN60.2_-_Installation_D%27Une_Grue_%C3%80_Tour_%28G-2%29_-_Notice_of_Tower_Crane_%28TC-2%29_Installation.pdf Notice of Tower Crane (TC-2) Installation (UPDATED)]'''
 +
|March 13, 2023
 +
 +
|To install a tower crane (TC-2) within the construction zone in front of Place du Portage III Tower B on Laurier Street.
 
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/e/e1/CN63_Tour_B1_et_A2_D%C3%A9couplage_des_Syst%C3%A8mes_m%C3%A9caniques_-_Decoupling_of_Towers_B1_A2_Mechanical_Systems.F.pdf Tower B1 & A2: Decoupling of Mechanical Systems]'''
 
|'''[https://wiki.gccollab.ca/images/e/e1/CN63_Tour_B1_et_A2_D%C3%A9couplage_des_Syst%C3%A8mes_m%C3%A9caniques_-_Decoupling_of_Towers_B1_A2_Mechanical_Systems.F.pdf Tower B1 & A2: Decoupling of Mechanical Systems]'''
Line 44: Line 54:  
|To perform needed maintenance to the High voltage Switchgear supplying power to Tower C.
 
|To perform needed maintenance to the High voltage Switchgear supplying power to Tower C.
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/3/33/CN67_-_D%C3%A9placement_de_la_salle_des_batteries_et_%C3%A9quipement_associ%C3%A9s_-_Re-Location_of_the_Switchgear_battery_room_and_associated_equipment.pdf Re-location of Switchgear Battery Room and Associated Equipment]'''
+
|'''[https://wiki.gccollab.ca/images/5/57/CN67.2_-_D%C3%A9placement_de_la_salle_des_batteries_et_%C3%A9quipement_associ%C3%A9s_-_Re-Location_of_the_Switchgear_battery_room_and_associated_equipment_.pdf Re-location of Switchgear Battery Room and Associated Equipment (UPDATED)]'''
 
|March 10, 2023
 
|March 10, 2023
 
   
 
   
Line 68: Line 78:  
   
 
   
 
|To outline and separate the occupied space from the demolition and abatement activities.  
 
|To outline and separate the occupied space from the demolition and abatement activities.  
|-
  −
|'''[https://wiki.gccollab.ca/images/2/24/CN60.1_Notice_of_Tower_Crane_%28TC-2%29_Installation_.pdf Notice of Tower Crane (TC-2) Installation]'''
  −
|February 15, 2023
  −
  −
|To install a tower crane (TC-2) within the construction zone in front of Place du Portage III Tower B on Laurier Street.
   
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/0/02/CN58.1_Electrical_Shutdown_in_Sub-Sector_Garage_mod_R1.pdf Electrical Shutdown in Laurier-Taché Parking Garage (Maisonneuve Sector) (UPDATED)]'''
 
|'''[https://wiki.gccollab.ca/images/0/02/CN58.1_Electrical_Shutdown_in_Sub-Sector_Garage_mod_R1.pdf Electrical Shutdown in Laurier-Taché Parking Garage (Maisonneuve Sector) (UPDATED)]'''