!'''Release Date'''
 
!'''Release Date'''
 
!'''Purpose'''
 
!'''Purpose'''
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/7/75/CN65_-_Fermeture_De_L%27escalier_De_Secours_Ext%C3%A9rieur_-_Closure_Of_Exterior_Emergency_Exit_Staircase.pdf Temporary Closure of Exterior Emergency Staircase]'''
 +
|March 16, 2023
 +
 +
|To allow for investigations and repairs to the compromised structural slab in Tower A (L03).
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/0/02/CN60.2_-_Installation_D%27Une_Grue_%C3%80_Tour_%28G-2%29_-_Notice_of_Tower_Crane_%28TC-2%29_Installation.pdf Notice of Tower Crane (TC-2) Installation (UPDATED)]'''
 +
|March 13, 2023
 +
 +
|To install a tower crane (TC-2) within the construction zone in front of Place du Portage III Tower B on Laurier Street.
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/e/e1/CN63_Tour_B1_et_A2_D%C3%A9couplage_des_Syst%C3%A8mes_m%C3%A9caniques_-_Decoupling_of_Towers_B1_A2_Mechanical_Systems.F.pdf Tower B1 & A2: Decoupling of Mechanical Systems]'''
 +
|March 13, 2023
 +
 +
|To separate the mechanical systems in Tower A2 from Tower B1.
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/1/1f/CN66_-_Remplacement_des_Composants_de_l%27Appareillage_d%27Alimentation_-_Switchgear_maintenance_for_Tower_C.pdf High Voltage Switchgear Component Replacement Feeding Tower C]'''
 +
|March 13, 2023
 +
 +
|To perform needed maintenance to the High voltage Switchgear supplying power to Tower C.
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/5/57/CN67.2_-_D%C3%A9placement_de_la_salle_des_batteries_et_%C3%A9quipement_associ%C3%A9s_-_Re-Location_of_the_Switchgear_battery_room_and_associated_equipment_.pdf Re-location of Switchgear Battery Room and Associated Equipment (UPDATED)]'''
 +
|March 10, 2023
 +
 +
|To re-locate the batteries and associated equipment that support the Switchgear which provides power complex wide.
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/5/5c/CN62_D%C3%A9limitation_et_palissade_de_construction_tour_B1_-_Construction_Hoarding_Tower_B1_L5.pdf Tower B1: Delineation and Hoarding Wall (L5)]'''
 +
|February 24, 2023
 +
 +
|To outline and separate the occupied space from the demolition and abatement activities.
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/7/7c/CN64_D%C3%A9molition_et_Construction_Tour_B1_N5_-_Demolition_Tower_B1_L5.pdf Tower B1: Demolition and Construction Activities (L5)]'''
 +
|February 24, 2023
 +
 +
|To complete Place du Portage III Asset and Workplace Renewal Project scheduled renovations.
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/2/29/CN61_Orientation_de_Site_Code_QR_Install%C3%A9_-_Site_Wayfinding_QR_Code_Installed.pdf Site Wayfinding QR Code]'''
 +
|February 16, 2023
 +
 +
|To provide a quick and paperless link to wayfinding on Portage III and Portage IV's site as part of the Place du Portage III AWR Project.
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/c/c6/CN54.2_Tour_D_et_E_Delimitation_et_Palissade_de_construction_-_Tower_D_and_E_Delineation_Hoarding_%28002%29.pdf Towers D & E: Delineation and Hoarding Wall (UDPATED)]'''
 +
|February 15, 2023
 +
 +
|To outline and separate the occupied space from the demolition and abatement activities.
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/0/02/CN58.1_Electrical_Shutdown_in_Sub-Sector_Garage_mod_R1.pdf Electrical Shutdown in Laurier-Taché Parking Garage (Maisonneuve Sector) (UPDATED)]'''
 +
|February 8, 2023
 +
 +
|To proceed with scheduled Tower C electrical maintenance.
 
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/d/d7/CN57._3_Tower_A_Storm_and_Sanitary_Pipe_Replacement.F2_.pdf Tower A: Storm and Sanitary Pipe Installation (UPDATED)]'''
 
|'''[https://wiki.gccollab.ca/images/d/d7/CN57._3_Tower_A_Storm_and_Sanitary_Pipe_Replacement.F2_.pdf Tower A: Storm and Sanitary Pipe Installation (UPDATED)]'''
Line 38: Line 88:  
   
 
   
 
|To demolish the existing pipe and reinstall a new underground sanitary and storm one in L03 (A0314) in Tower A.  
 
|To demolish the existing pipe and reinstall a new underground sanitary and storm one in L03 (A0314) in Tower A.  
|-
  −
|'''[https://wiki.gccollab.ca/images/f/fc/CN58_Electrical_Shutdown_in_Maisonneuve_Sub-Sector_Garage_CANCELLED_R1.pdf Electrical Shutdown in Laurier-Taché Parking Garage (Maisonneuve Sector) (CANCELED)]'''
  −
|February 1, 2023
  −
  −
|To proceed with scheduled Tower C electrical maintenance.
   
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/e/eb/CN38.2_Structural_Steel_Upgrades_in_Laurier-Tach%C3%A9_Parking_Garage.F2.pdf Tower Crane 2 (TC-2): Structural Steel Upgrades (UPDATED)]'''
 
|'''[https://wiki.gccollab.ca/images/e/eb/CN38.2_Structural_Steel_Upgrades_in_Laurier-Tach%C3%A9_Parking_Garage.F2.pdf Tower Crane 2 (TC-2): Structural Steel Upgrades (UPDATED)]'''
Line 68: Line 113:  
   
 
   
 
|To prepare the site for the construction and installation of the tower crane (TC-2).  
 
|To prepare the site for the construction and installation of the tower crane (TC-2).  
|-
  −
|'''[https://wiki.gccollab.ca/images/3/3a/CN54.1_Tower_D_and_E_Delineation_Hoarding.F2.pdf Towers D & E: Delineation and Hoarding Wall (UDPATED)]'''
  −
|January 18, 2022
  −
  −
|To outline and separate the occupied space from the demolition and abatement activities.
  −
|-
  −
|'''[https://wiki.gccollab.ca/images/5/5f/CN53.1_Construction_Hoarding_Tower_B1_L4_L8.F1.pdf Tower B1: Delineation and Hoarding Wall (UPDATED)]'''
  −
|January 17, 2022
  −
  −
|To outline and separate the occupied space from the demolition and abatement activities.
   
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/7/73/CN55_Tower_E_Construction_of_Partition_Wall.F1.V2.pdf Tower E: Construction of Partition Wall]'''
 
|'''[https://wiki.gccollab.ca/images/7/73/CN55_Tower_E_Construction_of_Partition_Wall.F1.V2.pdf Tower E: Construction of Partition Wall]'''
Line 139: Line 174:  
   
 
   
 
|To complete Place du Portage III Asset and Workplace Renewal (PDP3 AWR) Project scheduled renovations.
 
|To complete Place du Portage III Asset and Workplace Renewal (PDP3 AWR) Project scheduled renovations.
|-
  −
|'''[https://wiki.gccollab.ca/images/2/2b/CN35_fermeture_temporaire_acc%C3%A8s_au_quai_de_chargement_PDC-Temporary_Closure_of_Access_Route_to_Place_du_Centre_Loading_Dock02N.2022.pdf Place du Centre: Temporary Closure of Access Route to Loading Dock]'''
  −
|November 4, 2022
  −
  −
|To allow space to park a 90-Ton crane and assist with the installation of overhead protection.
  −
|-
  −
|'''[https://wiki.gccollab.ca/images/a/aa/CN-40_Tower_B1_L3_Asbestos_Abatement..F.pdf Asbestos Abatement in Tower B1 (L3)]'''
  −
|October 31, 2022
  −
  −
|To prepare the site for a new set of doors and to allow a new passage to the freight elevator in Tower A.
  −
|-
  −
|'''[https://wiki.gccollab.ca/images/d/d0/CN-39_Construction_Hoarding_PDPIV_Mechanical_Room.Final.pdf Delineation and Hoarding Wall in Mechanical Room]'''
  −
|October 28, 2022
  −
  −
|To delineate the construction space required to install the shear wall for PDP III Tower C as part of the PDP3 AWR Project.
  −
|-
  −
|'''[https://wiki.gccollab.ca/images/7/77/CN-36_Domestic_Water_Service_Interruption_R3.pdf Temporary Disruption of Domestic Water Supply On Emergency Basis]'''
  −
|October 21, 2022
  −
  −
|The main objective of the domestic water shutdown is due to concerns over the integrity of the pipe, and is required to allow for the reinforcement of the primary city water feed to Tower C ahead of excavation. This request is based on the emergency basis to replace Isolation valve of the fire suppression system.
  −
|-
  −
|'''[https://wiki.gccollab.ca/images/4/46/Asbestos_Abatement_Tower_A.F1.E%26F.pdf Tower A: Asbestos Abatement in Swing Spaces for Critical Tenants' Operations (L15)]'''
  −
|October 19, 2022
  −
  −
|To prepare the interim space for Tower B occupants.
   
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/1/17/Installation_of_Tower_Crane_in_Construction_Area.f.pdf Erection of Tower Crane (TC-1) in the construction area between PDP3 and PDP4 (Woodlands area)]'''
 
|'''[https://wiki.gccollab.ca/images/1/17/Installation_of_Tower_Crane_in_Construction_Area.f.pdf Erection of Tower Crane (TC-1) in the construction area between PDP3 and PDP4 (Woodlands area)]'''