!'''Purpose'''
 
!'''Purpose'''
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/a/aa/CN-40_Tower_B1_L3_Asbestos_Abatement..F.pdf Asbestos Abatement in Tower B1 (L3)]'''
+
|'''[https://wiki.gccollab.ca/images/7/75/CN65_-_Fermeture_De_L%27escalier_De_Secours_Ext%C3%A9rieur_-_Closure_Of_Exterior_Emergency_Exit_Staircase.pdf Temporary Closure of Exterior Emergency Staircase]'''
|October 31, 2022
+
|March 16, 2023
 
   
 
   
|To prepare the site for a new set of doors and to allow a new passage to the freight elevator in Tower A.
+
|To allow for investigations and repairs to the compromised structural slab in Tower A (L03).
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/d/d0/CN-39_Construction_Hoarding_PDPIV_Mechanical_Room.Final.pdf Delineation and Hoarding Wall in Mechanical Room]'''
+
|'''[https://wiki.gccollab.ca/images/0/02/CN60.2_-_Installation_D%27Une_Grue_%C3%80_Tour_%28G-2%29_-_Notice_of_Tower_Crane_%28TC-2%29_Installation.pdf Notice of Tower Crane (TC-2) Installation (UPDATED)]'''
|October 28, 2022
+
|March 13, 2023
 
   
 
   
|To delineate the construction space required to install the shear wall for PDP III Tower C as part of the PDP3 AWR Project.
+
|To install a tower crane (TC-2) within the construction zone in front of Place du Portage III Tower B on Laurier Street.
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/5/5e/CN38_Structural_Steel_Upgrades_in_Laurier-Tach%C3%A9_Parking_Garage.F.pdf Tower Crane 2 (TC-2): Structural Steel Upgrades]'''
+
|'''[https://wiki.gccollab.ca/images/e/e1/CN63_Tour_B1_et_A2_D%C3%A9couplage_des_Syst%C3%A8mes_m%C3%A9caniques_-_Decoupling_of_Towers_B1_A2_Mechanical_Systems.F.pdf Tower B1 & A2: Decoupling of Mechanical Systems]'''
|October 27, 2022
+
|March 13, 2023
 
   
 
   
|To allow for the tower crane openings that are required for its erection in the Laurier-Taché Parking Garage through levels P1, P2 and P3.
+
|To separate the mechanical systems in Tower A2 from Tower B1.
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/1/1f/CN66_-_Remplacement_des_Composants_de_l%27Appareillage_d%27Alimentation_-_Switchgear_maintenance_for_Tower_C.pdf High Voltage Switchgear Component Replacement Feeding Tower C]'''
 +
|March 13, 2023
 +
 +
|To perform needed maintenance to the High voltage Switchgear supplying power to Tower C.
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/5/57/CN67.2_-_D%C3%A9placement_de_la_salle_des_batteries_et_%C3%A9quipement_associ%C3%A9s_-_Re-Location_of_the_Switchgear_battery_room_and_associated_equipment_.pdf Re-location of Switchgear Battery Room and Associated Equipment (UPDATED)]'''
 +
|March 10, 2023
 +
 +
|To re-locate the batteries and associated equipment that support the Switchgear which provides power complex wide.
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/5/5c/CN62_D%C3%A9limitation_et_palissade_de_construction_tour_B1_-_Construction_Hoarding_Tower_B1_L5.pdf Tower B1: Delineation and Hoarding Wall (L5)]'''
 +
|February 24, 2023
 +
 +
|To outline and separate the occupied space from the demolition and abatement activities.
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/7/7c/CN64_D%C3%A9molition_et_Construction_Tour_B1_N5_-_Demolition_Tower_B1_L5.pdf Tower B1: Demolition and Construction Activities (L5)]'''
 +
|February 24, 2023
 +
 +
|To complete Place du Portage III Asset and Workplace Renewal Project scheduled renovations.  
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/7/77/CN-36_Domestic_Water_Service_Interruption_R3.pdf Temporary Disruption of Domestic Water Supply On Emergency Basis]'''
+
|'''[https://wiki.gccollab.ca/images/2/29/CN61_Orientation_de_Site_Code_QR_Install%C3%A9_-_Site_Wayfinding_QR_Code_Installed.pdf Site Wayfinding QR Code]'''
|October 21, 2022
+
|February 16, 2023
 
   
 
   
|The main objective of the domestic water shutdown is due to concerns over the integrity of the pipe, and is required to allow for the reinforcement of the primary city water feed to Tower C ahead of excavation. This request is based on the emergency basis to replace Isolation valve of the fire suppression system.  
+
|To provide a quick and paperless link to wayfinding on Portage III and Portage IV's site as part of the Place du Portage III AWR Project.  
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/4/46/Asbestos_Abatement_Tower_A.F1.E%26F.pdf Tower A: Asbestos Abatement in Swing Spaces for Critical Tenants' Operations (L15)]'''
+
|'''[https://wiki.gccollab.ca/images/c/c6/CN54.2_Tour_D_et_E_Delimitation_et_Palissade_de_construction_-_Tower_D_and_E_Delineation_Hoarding_%28002%29.pdf Towers D & E: Delineation and Hoarding Wall (UDPATED)]'''
|October 19, 2022
+
|February 15, 2023
 
   
 
   
|To prepare the interim space for Tower B occupants.
+
|To outline and separate the occupied space from the demolition and abatement activities.  
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/1/17/Installation_of_Tower_Crane_in_Construction_Area.f.pdf Erection of Tower Crane (TC-1) in the construction area between PDP3 and PDP4 (Woodlands area)]'''
+
|'''[https://wiki.gccollab.ca/images/0/02/CN58.1_Electrical_Shutdown_in_Sub-Sector_Garage_mod_R1.pdf Electrical Shutdown in Laurier-Taché Parking Garage (Maisonneuve Sector) (UPDATED)]'''
|October 11, 2022
+
|February 8, 2023
 
   
 
   
|The erection of the tower crane (TC-1) is one of the PDP3 AWR Project milestones as it visually symbolizes the beginning of the demolition activities.
+
|To proceed with scheduled Tower C electrical maintenance.  
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/d/d2/Tower_Crane_Installation_-_Laurier-Tach%C3%A9_Parking_Garage.F.pdf Tower Crane Installation in Laurier-Taché Parking Garage]'''
+
|'''[https://wiki.gccollab.ca/images/d/d7/CN57._3_Tower_A_Storm_and_Sanitary_Pipe_Replacement.F2_.pdf Tower A: Storm and Sanitary Pipe Installation (UPDATED)]'''
|October 6, 2022
+
|February 3, 2023
 
   
 
   
|To prepare the site for the construction and installation of the tower crane (TC-2).  
+
|To demolish the existing pipe and reinstall a new underground sanitary and storm one in L03 (A0314) in Tower A.  
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/4/44/Tower_B1_Delineation_HoardingF.Bgis.pdf Towers A & B: Delineation and Hoarding Wall (L1, L2 and L3)]'''
+
|'''[https://wiki.gccollab.ca/images/e/eb/CN38.2_Structural_Steel_Upgrades_in_Laurier-Tach%C3%A9_Parking_Garage.F2.pdf Tower Crane 2 (TC-2): Structural Steel Upgrades (UPDATED)]'''
|September 26, 2022
+
|January 27, 2023
 
   
 
   
|To outline and separate the occupied space in Tower A2 from the construction activities in Tower B1.  
+
|To allow for the tower crane openings that are required for its erection in the Laurier-Taché Parking Garage through levels P1, P2 and P3.
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/5/50/Tower_B_Exterior_Civil_Works.F.pdf Tower B: Exterior Demolition]'''
+
|'''[https://wiki.gccollab.ca/images/9/91/CN17.1_Mission_Critical_Spaces_Tower_A-F1.pdf Mission Critical Spaces (L15)]'''
|September 20, 2022
+
|January 27, 2023
 
   
 
   
|To install temporary new stairs to allow, emergency access and egress during construction activities, and the demolition of the existing stairs. These enabling work activities are required to set up the ElissDon laydown area for construction.
+
|To complete A1 and A2 Towers construction fit up, to accommodate B1 Tower tenants.
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/3/34/GOC479411_AWR_PDP3_-_Bicycle_Shelter_New_Location.Final.pdf Bicycle Enclosure Relocation]'''
+
|'''[https://wiki.gccollab.ca/images/c/cf/CN59_Tower_B3_Delineation_and_Hoarding_Wall.F2.pdf Tower B3: Delineation and Hoarding Wall (L0)]'''
|September 6, 2022
+
|January 20, 2023
 
   
 
   
|To facilitate the additional site logistics required for the Construction Manager to install exterior hoarding in preparation for construction work around PDP III Tower C.
+
|To outline and separate the occupied space from the demolition and abatement activities.  
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/6/6a/Tower_C_Closure_Wayfinding_-_Exterior_Final_Version.pdf Towers C and D Closure: Pedestrians Wayfinding Plans (Exterior)]'''
+
|'''[https://wiki.gccollab.ca/images/8/8f/CN50.1_Construction_Hoarding_Tower_B3_L01_L02F1.pdf Tower B3: Delineation and Hoarding Wall (L01 & L02)]'''
|September 6, 2022
+
|January 19, 2023
 
   
 
   
|How to circulate between PDP4 and the A/B/E towers of PDP3 (exterior).
+
|To outline and separate the occupied space from the demolition and abatement activities.  
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/e/e4/PDP_3-4_Interior_Walkway_Final.pdf Towers C and D Closure: Pedestrians Wayfinding Plans (Interior)]'''
+
|'''[https://wiki.gccollab.ca/images/f/f6/CN29.2_Tower_Crane_Installation_Laurier-Tach%C3%A9_Parking_Garage.F2.pdf Tower Crane Installation in Laurier-Taché Parking Garage (UPDATED)]'''
|September 6, 2022
+
|January 19, 2023
 
   
 
   
|How to circulate between PDP4 and the A/B/E towers of PDP3 (interior).
+
|To prepare the site for the construction and installation of the tower crane (TC-2).  
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/0/05/CN-23_Tree_Removal_at_Courcelette_and_Laurier_F.pdf Removal of Trees and Shrubs]'''
+
|'''[https://wiki.gccollab.ca/images/7/73/CN55_Tower_E_Construction_of_Partition_Wall.F1.V2.pdf Tower E: Construction of Partition Wall]'''
|August 22, 2022
+
|January 6, 2023
 
   
 
   
|To prepare the area for the upcoming construction of the curtain wall mockup.
+
|To outline and separate the occupied space from the bulk of demolition and abatement activities while the Security Operations Centre remains in place (02B2-101).  
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/0/02/Laurier_Sidewalk_Closure_%28CN-24%29.pdf Sidewalk Closure: Laurier Street]'''
+
|'''[https://wiki.gccollab.ca/images/a/aa/CN_56_Temporary_Disruption_to_Garage_Door_Openers.Canceled1.pdf Temporary Disruption to the Laurier-Taché Parking Garage Door Operators (CANCELED)]'''
|August 16, 2022
+
|January 3, 2023
 
   
 
   
|To facilitate the additional site logistics required for the Construction Manager (CM) to isolate the access to egress for site deliveries, loading and unloading. The implementation of this measure is also to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
+
|To remove, then relocate the fiber optic cables, including conduits and boxes that control the garage door openers within the Laurier-Taché parking garage. The conduits and boxes are currently located in L02 in Tower C on a block wall that is scheduled to be demolished.  
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/4/4b/Laurier_Traffic_Lane_Closure_CN-14.F.pdf Traffic Lane Closure: Laurier Street]'''
+
|'''[https://wiki.gccollab.ca/images/0/08/CN-42_Opening_of_Interim_Mailroom.F.pdf Opening of Interim Mailroom]'''
|August 16, 2022
+
|December 19, 2022
 
   
 
   
|To facilitate the additional site logistics required for the Construction Manager (CM) to isolate the access to egress for site deliveries, loading and unloading. The implementation of this measure is also to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
+
|To move the mailroom occupants from the old location in Tower B3 to the new location in Tower B2.  
 +
Note: The old mailroom location is scheduled for demolition as part of phase 1 of the PDP3 AWR Project.
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/a/ad/PDP_IV_Sign_Reinstatement_%28CN-14%29.F.pdf PDP IV: Sign replacement]'''
+
|'''[https://wiki.gccollab.ca/images/8/82/CN27.2_Tower_B_Exterior_Civil_WorksF.pdf Tower B: Exterior Demolition (UPDATED)]'''
|August 15, 2022
+
|December 19, 2022
 
   
 
   
|To install the new PDP IV sign onto the exterior corner of the building, next to the Woodlands Area.
+
|To install temporary new stairs to allow emergency access and egress during construction activities and demolish existing stairs.
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/d/d1/GOC479411-PDP_3_AWR-Critical_Spaces.F.pdf Mission Critical Spaces]'''
+
|'''[https://wiki.gccollab.ca/images/4/47/CN52_Mobile_Crane_Preparation.F.pdf Preparation of the Mobile Crane Base]'''
|August 2, 2022
+
|December 14, 2022
 
   
 
   
|To complete A1 and A2 Towers construction fit up, to accommodate B1 Tower tenants.
+
|To prepare the base, a granular pad, for the installation of the mobile crane on Laurier Street, which is to assist with the installation of the Tower Crane (TC-2) within the exterior construction zone of Tower B.
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/d/dd/GOC479411_PDP_3_AWR_-_PDP_IV_Wayfinding.pdf Place du Portage IV: Wayfinding]'''
+
|'''[https://wiki.gccollab.ca/images/1/18/CN51_Temporary_Shutdown_of_Tower_C_Generator.F.pdf Tower C: Removal of Emergency Generator]'''
|August 2, 2022
+
|December 2, 2022
 
   
 
   
|To facilitate the construction renovations, including the Tower C Curtainwall Upgrades; Tower C Interior Upgrades; and Structural Upgrades for the Place du Portage AWR Project.
+
|To disconnect Tower C generator and then reconnect the feeds to the generators in Towers A and B to ensure backup electricity in the event of an electrical power outage.
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/1/1d/GOC479411-PDP_3_AWR-Tower_A_and_B_Delineation_Hoarding.F.pdf Towers A & B: Delineation and Hoarding Wall]'''
+
|'''[https://wiki.gccollab.ca/images/b/bb/CN47_Installation_Mobilization_of_Mobile_Platforms_in_Tower_C1_C2.F2.pdf Installation and Mobilization of Mast Climbers]'''
|August 2, 2022
+
|December 2, 2022
 
   
 
   
|To outline and separate the occupied space in Tower A2 from the construction activities in Tower B1.
+
|To assist in the removal of the exterior envelope of Towwers C1/C2.
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/7/7c/Laurier-Tache_Parking_Garage_Closure-Maisonneuve.Aug2_FINAL.pdf Temporary Partial Closure: Laurier-Taché Parking Garage]'''
+
|'''[https://wiki.gccollab.ca/images/c/c0/CN44_Temporary_Shutdown_of_Primary_Chilled_Water_Loop.F.Nov25.pdf Temporary Shutdown of Primary Chilled Water Loop (UPDATED)]'''
|August 2, 2022
+
|November 25, 2022
 
   
 
   
|To facilitate the following renovations: installation of a new elevator pit; an interruption in the ventilation system; structural upgrades; and replacement of underground piping.
+
|To directly reconnect critical mechanical equipment (V-30, V-72 and V-74) to the primary chilled water loop to accommodate the demolition of the pumps and heat exchangers in Tower C Level 02. Space in the mechanical room is required for construction of the concrete shear wall and associated re-shoring.
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/2/2a/GOC479411_PDP3_AWR_Tower_B_Exterior_Hoarding.Final.pdf Hoarding Wall: Tower B Exterior]'''
+
|'''[https://wiki.gccollab.ca/images/e/ec/CN49_Removal_of_Emergency_Generator_Tower_C.Bgis.pdf Tower C: Emergency Generator Removal]'''
|July 29, 2022
+
|November 18, 2022
 
   
 
   
|To facilitate the additional site logistics required for the Construction Manager (CM) to isolate the access to egress for site deliveries, loading and unloading. The implementation of this measure is to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
+
|To disconnect the Tower C generator and then reconnect its emergency load to the generator control panel in Tower B to ensure backup electricity in the event of an electrical power outage.
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/1/13/1-_Tower_A_and_B_Delineation_Hoarding.pdf Tower A and B Delineation Hoarding]'''
+
|'''[https://wiki.gccollab.ca/images/4/4c/CN41_Construction_Hoarding-Tower_B1-L0.R1Final.Nov17docx.pdf Tower B1 - Level 0: Construction Hoarding (UPDATED)]'''
|July 14, 2022
+
|November 17, 2022
 
   
 
   
|Outline and separate the occupied space in Tower A2 from the construction activities in Tower B1.
+
|To create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project.
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/c/c5/2-Interim_Mailroom_Demolition_and_Abatement.pdf Interim Mailroom Demolition and Abatement]'''
+
|'''[https://wiki.gccollab.ca/images/7/73/CN46_Demolition_Tower_B1_and_B3_%28L1_L2_L3%29F.Nov17.pdf Towers B1 & B3: Demolition and Construction Activities (L1, L2 & L3)]'''
|July 14, 2022
+
|November 17, 2022
 
   
 
   
|See notice
+
|To complete Place du Portage III Asset and Workplace Renewal (PDP3 AWR) Project scheduled renovations.
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/3/3f/GOC479411-_PDP_3_AWR-_Construction_de_la_salle_de_courrier_provisoire.Bgis.pdf Interim Mailroom Construction]'''
+
|'''[https://wiki.gccollab.ca/images/8/84/CN45_Demolition_Tower_B1_and_B3_%28L6-L12%29.F.Nov17_%28002%29.pdf Towers B1 & B3: Demolition and Construction Activities (L6 to L12)]'''
|June 20, 2022
+
|November 17, 2022
 
   
 
   
|See notice.
+
|To complete Place du Portage III Asset and Workplace Renewal (PDP3 AWR) Project scheduled renovations.
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/6/61/GOC479411-_PDP_3_AWR-_CM-_Avis_-_Maisonneuve.pdf Sidewalk and Lane Closure on Maisonneuve Boulevard]'''
+
|'''[https://wiki.gccollab.ca/images/1/17/Installation_of_Tower_Crane_in_Construction_Area.f.pdf Erection of Tower Crane (TC-1) in the construction area between PDP3 and PDP4 (Woodlands area)]'''
|May 24, 2022
+
|October 11, 2022
 
   
 
   
|To facilitate the additional site logistics required for the CM and to isolate the access to egress for site deliveries, loading and unloading. Additionally, the measures are required to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
+
|The erection of the tower crane (TC-1) is one of the PDP3 AWR Project milestones as it visually symbolizes the beginning of the demolition activities.
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/1/13/GOC479411-PDP_3_AWR-_CM-Tower_C_North_Couryard_Construction_Hoarding_C0_Communications_Notice.Final.pdf Construction Hoarding: Tower C - North Courtyard]'''
+
|'''[https://wiki.gccollab.ca/images/3/34/GOC479411_AWR_PDP3_-_Bicycle_Shelter_New_Location.Final.pdf Bicycle Enclosure Relocation]'''
|May 24, 2022
+
|September 6, 2022
 
   
 
   
|To facilitate the additional site logistics required for the Construction Manager and to isolate the access to egress for site deliveries, loading and unloading. Additionally, the measures are required to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
+
|To facilitate the additional site logistics required for the Construction Manager to install exterior hoarding in preparation for construction work around PDP III Tower C.
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/5/5c/GOC479411-_PDP_3_AWR-_CM-Tower_B_Construction_Hoarding_Communications_Notice.Final.pdf Construction Hoarding: Tower B - Exterior]'''
+
|'''[https://wiki.gccollab.ca/images/6/6a/Tower_C_Closure_Wayfinding_-_Exterior_Final_Version.pdf Towers C and D Closure: Pedestrians Wayfinding Plans (Exterior)]'''
|May 24, 2022
+
|September 6, 2022
 
   
 
   
|To facilitate the additional site logistics required for the Construction Manager and to isolate the access to egress for site deliveries, loading and unloading. Additionally, the measures are required to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
+
|How to circulate between PDP4 and the A/B/E towers of PDP3 (exterior).
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/d/d7/1-_Construction_hoarding_activities.pdf Construction hoarding activities]'''
+
|'''[https://wiki.gccollab.ca/images/e/e4/PDP_3-4_Interior_Walkway_Final.pdf Towers C and D Closure: Pedestrians Wayfinding Plans (Interior)]'''
|April 6, 2022
+
|September 6, 2022
 
   
 
   
|The main objective of the construction hoarding activities is to create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project.
+
|How to circulate between PDP4 and the A/B/E towers of PDP3 (interior).
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/2/2c/2-Environmental_Soil_Study_Characterization.pdf Environmental Soil Study Characterization]'''
+
|'''[https://wiki.gccollab.ca/images/0/02/Laurier_Sidewalk_Closure_%28CN-24%29.pdf Sidewalk Closure: Laurier Street]'''
|April 5, 2022
+
|August 16, 2022
 
   
 
   
|To help identify potential contaminants in the soil in and around the project area. Information gathered during this work will help describe the environmental quality of the soil.
+
|To facilitate the additional site logistics required for the Construction Manager (CM) to isolate the access to egress for site deliveries, loading and unloading. The implementation of this measure is also to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/5/50/3-_Tree_Removal_Activities.pdf Tree Removal Activities]'''
+
|'''[https://wiki.gccollab.ca/images/4/4b/Laurier_Traffic_Lane_Closure_CN-14.F.pdf Traffic Lane Closure: Laurier Street]'''
|March 25, 2022
+
|August 16, 2022
 
   
 
   
|To facilitate additional site logistics requirements for the Construction Manager (CM) to enable construction related activities in preparation of the PDP3 AWR Project and to update the landscape and riverfront greenbelt in connection to the complex.
+
|To facilitate the additional site logistics required for the Construction Manager (CM) to isolate the access to egress for site deliveries, loading and unloading. The implementation of this measure is also to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/6/63/4-_Construction_hoarding_activities_%28Interim_space%29.pdf Construction hoarding activities (Interim space)]'''
+
|'''[https://wiki.gccollab.ca/images/d/dd/GOC479411_PDP_3_AWR_-_PDP_IV_Wayfinding.pdf Place du Portage IV: Wayfinding]'''
|February 22, 2022
+
|August 2, 2022
 
   
 
   
|To create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project.
+
|To facilitate the construction renovations, including the Tower C Curtainwall Upgrades; Tower C Interior Upgrades; and Structural Upgrades for the Place du Portage AWR Project.
 
|-
 
|-
 
+
|'''[https://wiki.gccollab.ca/images/7/7c/Laurier-Tache_Parking_Garage_Closure-Maisonneuve.Aug2_FINAL.pdf Temporary Partial Closure: Laurier-Taché Parking Garage]'''
|'''[https://wiki.gccollab.ca/images/5/5d/5-_Construction_hoarding_%28CM_site%29.pdf Construction hoarding (CM site)]'''
+
|August 2, 2022
|February 17, 2022
   
   
 
   
|To create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project.
+
|To facilitate the following renovations: installation of a new elevator pit; an interruption in the ventilation system; structural upgrades; and replacement of underground piping.
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/8/80/6-_Construction_hoarding.pdf Construction hoarding]'''
+
|'''[https://wiki.gccollab.ca/images/2/2a/GOC479411_PDP3_AWR_Tower_B_Exterior_Hoarding.Final.pdf Hoarding Wall: Tower B Exterior]'''
|February 11, 2022
+
|July 29, 2022
 
   
 
   
|To create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project.
+
|To facilitate the additional site logistics required for the Construction Manager (CM) to isolate the access to egress for site deliveries, loading and unloading. The implementation of this measure is to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/7/76/7-_Tree_removal_activities_%28Woodland_Area%29.pdf Tree removal activities (Woodland Area)]'''
+
|'''[https://wiki.gccollab.ca/images/6/61/GOC479411-_PDP_3_AWR-_CM-_Avis_-_Maisonneuve.pdf Sidewalk and Lane Closure on Maisonneuve Boulevard]'''
|February 9, 2022
+
|May 24, 2022
 
   
 
   
|To create an interim construction laydown area for the CM to enable construction related activities in preparation of the PDP3 AWR Project; and an opportunity to update the landscape and Riverfront Greenbelt connection to the complex.
+
|To facilitate the additional site logistics required for the CM and to isolate the access to egress for site deliveries, loading and unloading. Additionally, the measures are required to ensure the safety and protection of the public and to contain the construction site within the hoarding walls.
 
|}
 
|}
 
<br>
 
<br>
 
<u><small>[[Place_du_Portage_III_Asset_and_Workplace_Renewal_Project| <i>Back to Welcome Page</I>]]</small></u><br>
 
<u><small>[[Place_du_Portage_III_Asset_and_Workplace_Renewal_Project| <i>Back to Welcome Page</I>]]</small></u><br>
 
</div>
 
</div>