Changes

Line 269: Line 269:  
   
 
   
 
|To help identify potential contaminants in the soil in and around the project area. Information gathered during this work will help describe the environmental quality of the soil.
 
|To help identify potential contaminants in the soil in and around the project area. Information gathered during this work will help describe the environmental quality of the soil.
|-
  −
|'''[https://wiki.gccollab.ca/images/5/50/3-_Tree_Removal_Activities.pdf Tree Removal Activities]'''
  −
|March 25, 2022
  −
  −
|To facilitate additional site logistics requirements for the Construction Manager (CM) to enable construction related activities in preparation of the PDP3 AWR Project and to update the landscape and riverfront greenbelt in connection to the complex.
  −
|-
  −
|'''[https://wiki.gccollab.ca/images/6/63/4-_Construction_hoarding_activities_%28Interim_space%29.pdf Construction hoarding activities (Interim space)]'''
  −
|February 22, 2022
  −
  −
|To create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project.
   
|}
 
|}
 
<br>
 
<br>
 
<u><small>[[Place_du_Portage_III_Asset_and_Workplace_Renewal_Project| <i>Back to Welcome Page</I>]]</small></u><br>
 
<u><small>[[Place_du_Portage_III_Asset_and_Workplace_Renewal_Project| <i>Back to Welcome Page</I>]]</small></u><br>
 
</div>
 
</div>