| !'''Release Date''' | | !'''Release Date''' |
| !'''Purpose''' | | !'''Purpose''' |
| + | |- |
| + | |'''[https://wiki.gccollab.ca/images/5/52/CN38.1_Structural_Steel_Upgrades_in_Laurier-Tach%C3%A9_Parking_Garage.F.pdf Tower Crane 2 (TC-2): Structural Steel Upgrades (UPDATED)]''' |
| + | |November 25, 2022 |
| + | |
| + | |To allow for the tower crane openings that are required for its erection in the Laurier-Taché Parking Garage through levels P1, P2 and P3. |
| + | |- |
| + | |'''[https://wiki.gccollab.ca/images/8/81/CN29.1_Tower_Crane_Installation-Laurier-Tach%C3%A9ParkingGarage.F.pdf Tower Crane Installation in Laurier-Taché Parking Garage (UPDATED)]''' |
| + | |November 25, 2022 |
| + | |
| + | |To prepare the site for the construction and installation of the tower crane (TC-2). |
| + | |- |
| + | |'''[https://wiki.gccollab.ca/images/c/c0/CN44_Temporary_Shutdown_of_Primary_Chilled_Water_Loop.F.Nov25.pdf Temporary Shutdown of Primary Chilled Water Loop (UPDATED)]''' |
| + | |November 25, 2022 |
| + | |
| + | |To directly reconnect critical mechanical equipment (V-30, V-72 and V-74) to the primary chilled water loop to accommodate the demolition of the pumps and heat exchangers in Tower C Level 02. Space in the mechanical room is required for construction of the concrete shear wall and associated re-shoring. |
| |- | | |- |
| |'''[https://wiki.gccollab.ca/images/e/ec/CN49_Removal_of_Emergency_Generator_Tower_C.Bgis.pdf Tower C: Emergency Generator Removal]''' | | |'''[https://wiki.gccollab.ca/images/e/ec/CN49_Removal_of_Emergency_Generator_Tower_C.Bgis.pdf Tower C: Emergency Generator Removal]''' |
Line 48: |
Line 63: |
| | | |
| |To complete Place du Portage III Asset and Workplace Renewal (PDP3 AWR) Project scheduled renovations. | | |To complete Place du Portage III Asset and Workplace Renewal (PDP3 AWR) Project scheduled renovations. |
− | |-
| |
− | |'''[https://wiki.gccollab.ca/images/4/47/CN44_Temporary_Shutdown_of_Primary_Chilled_Water_Loop.F.Nov17.pdf Temporary Shutdown of Primary Chilled Water Loop]'''
| |
− | |November 17, 2022
| |
− |
| |
− | |To directly reconnect critical mechanical equipment (V-30, V-72 and V-74) to the primary chilled water loop to accommodate the demolition of the pumps and heat exchangers in Tower C Level 02. Space in the mechanical room is required for construction of the concrete shear wall and associated re-shoring.
| |
| |- | | |- |
| |'''[https://wiki.gccollab.ca/images/8/84/CN45_Demolition_Tower_B1_and_B3_%28L6-L12%29.F.Nov17_%28002%29.pdf Towers B1 & B3: Demolition and Construction Activities (L6 to L12)]''' | | |'''[https://wiki.gccollab.ca/images/8/84/CN45_Demolition_Tower_B1_and_B3_%28L6-L12%29.F.Nov17_%28002%29.pdf Towers B1 & B3: Demolition and Construction Activities (L6 to L12)]''' |
Line 83: |
Line 93: |
| | | |
| |To delineate the construction space required to install the shear wall for PDP III Tower C as part of the PDP3 AWR Project. | | |To delineate the construction space required to install the shear wall for PDP III Tower C as part of the PDP3 AWR Project. |
− | |-
| |
− | |'''[https://wiki.gccollab.ca/images/5/5e/CN38_Structural_Steel_Upgrades_in_Laurier-Tach%C3%A9_Parking_Garage.F.pdf Tower Crane 2 (TC-2): Structural Steel Upgrades]'''
| |
− | |October 27, 2022
| |
− |
| |
− | |To allow for the tower crane openings that are required for its erection in the Laurier-Taché Parking Garage through levels P1, P2 and P3.
| |
| |- | | |- |
| |'''[https://wiki.gccollab.ca/images/7/77/CN-36_Domestic_Water_Service_Interruption_R3.pdf Temporary Disruption of Domestic Water Supply On Emergency Basis]''' | | |'''[https://wiki.gccollab.ca/images/7/77/CN-36_Domestic_Water_Service_Interruption_R3.pdf Temporary Disruption of Domestic Water Supply On Emergency Basis]''' |
Line 103: |
Line 108: |
| | | |
| |The erection of the tower crane (TC-1) is one of the PDP3 AWR Project milestones as it visually symbolizes the beginning of the demolition activities. | | |The erection of the tower crane (TC-1) is one of the PDP3 AWR Project milestones as it visually symbolizes the beginning of the demolition activities. |
− | |-
| |
− | |'''[https://wiki.gccollab.ca/images/d/d2/Tower_Crane_Installation_-_Laurier-Tach%C3%A9_Parking_Garage.F.pdf Tower Crane Installation in Laurier-Taché Parking Garage]'''
| |
− | |October 6, 2022
| |
− |
| |
− | |To prepare the site for the construction and installation of the tower crane (TC-2).
| |
| |- | | |- |
| |'''[https://wiki.gccollab.ca/images/4/44/Tower_B1_Delineation_HoardingF.Bgis.pdf Towers A & B: Delineation and Hoarding Wall (L1, L2 and L3)]''' | | |'''[https://wiki.gccollab.ca/images/4/44/Tower_B1_Delineation_HoardingF.Bgis.pdf Towers A & B: Delineation and Hoarding Wall (L1, L2 and L3)]''' |