Changes

Jump to navigation Jump to search
Line 33: Line 33:  
!'''Release Date'''
 
!'''Release Date'''
 
!'''Purpose'''
 
!'''Purpose'''
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/8/81/CN29.1_Tower_Crane_Installation-Laurier-Tach%C3%A9ParkingGarage.F.pdf Tower Crane Installation in Laurier-Taché Parking Garage]'''
 +
|November 25, 2022
 +
 +
|To prepare the site for the construction and installation of the tower crane (TC-2).
 
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/c/c0/CN44_Temporary_Shutdown_of_Primary_Chilled_Water_Loop.F.Nov25.pdf Temporary Shutdown of Primary Chilled Water Loop (UPDATED)]'''
 
|'''[https://wiki.gccollab.ca/images/c/c0/CN44_Temporary_Shutdown_of_Primary_Chilled_Water_Loop.F.Nov25.pdf Temporary Shutdown of Primary Chilled Water Loop (UPDATED)]'''
Line 103: Line 108:  
   
 
   
 
|The erection of the tower crane (TC-1) is one of the PDP3 AWR Project milestones as it visually symbolizes the beginning of the demolition activities.
 
|The erection of the tower crane (TC-1) is one of the PDP3 AWR Project milestones as it visually symbolizes the beginning of the demolition activities.
|-
  −
|'''[https://wiki.gccollab.ca/images/d/d2/Tower_Crane_Installation_-_Laurier-Tach%C3%A9_Parking_Garage.F.pdf Tower Crane Installation in Laurier-Taché Parking Garage]'''
  −
|October 6, 2022
  −
  −
|To prepare the site for the construction and installation of the tower crane (TC-2).
   
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/4/44/Tower_B1_Delineation_HoardingF.Bgis.pdf Towers A & B: Delineation and Hoarding Wall (L1, L2 and L3)]'''
 
|'''[https://wiki.gccollab.ca/images/4/44/Tower_B1_Delineation_HoardingF.Bgis.pdf Towers A & B: Delineation and Hoarding Wall (L1, L2 and L3)]'''

Navigation menu

GCwiki