Difference between revisions of "Académie du numérique/Accélérateur du numérique EFPC/Calendrier principal"

From wiki
Jump to navigation Jump to search
Line 1: Line 1:
 
[[File:CSPS Digital Accelerator.png|left|frameless|1218x1218px]]
 
[[File:CSPS Digital Accelerator.png|left|frameless|1218x1218px]]
 
<br><br><br><br><br><br><br><br><br><br>
 
<br><br><br><br><br><br><br><br><br><br>
== Week 1 (Jan 10) ==
+
== Semaine 1 (Jan 10) ==
 
{| class="wikitable"
 
{| class="wikitable"
 
!Day of the Week
 
!Day of the Week
Line 9: Line 9:
 
!Participants
 
!Participants
 
|-
 
|-
| rowspan="2" |Monday
+
| rowspan="2" |Lundi
 
|
 
|
|Welcome to the Accelerator
+
|Bienvenue à l’Accélérateur
|1.5 hours
+
|1.5 heures
|Product team required
+
|Équipe de produit requise
Executives required
+
Cadres supérieurs requis
 
|-
 
|-
 
|
 
|
|Introduction to Miro
+
|Introduction à Miro
|1 hour
+
|1 heure
|Product team required
+
|Équipe de produit requise
Executives optional
+
Cadres supérieurs optionnelle
 
|-
 
|-
| rowspan="2" |Tuesday
+
| rowspan="2" |Mardi
 
|
 
|
|Team Building
+
|Renforcement de l’esprit d’équipe
|2.5 hours
+
|2.5 heures
|Product team required
+
|Équipe de produit requise
Executives required
+
Cadres supérieurs requis
 
|-
 
|-
 
|
 
|
|Human-Centered Design
+
|Conception centrée sur la personne
|3 hours
+
|3 heures
 
|
 
|
 
|-
 
|-
|Wednesday
+
|Mercredi
 
|
 
|
|Exploring the Problem Space
+
|Exploration de l’espace du problème
|2 hours
+
|2 heures
|Product team required
+
|Équipe de produit requise
Executives optional
+
Cadres supérieurs optionnelle
 
|-
 
|-
|Thursday
+
|Jeudi
 
!
 
!
 
!
 
!
Line 47: Line 47:
 
!
 
!
 
|-
 
|-
| rowspan="2" |Friday
+
| rowspan="2" |Vendredi
 
|
 
|
|End of week check-in
+
|Séance de suivi à la fin de la semaine
 
|45 minutes
 
|45 minutes
|Product team required
+
|Équipe de produit requise
Executives required
+
Cadres supérieurs requis
 
|-
 
|-
 
|
 
|
|Lunch and Learn - with Liz McKeown
+
|Dîner‑causerie avec Liz  
|1 hour
+
|1 heure
|Product team optional
+
|Présence de l’équipe de produit optionnelle
Executives optional
+
Cadres supérieurs optionnelle
 
|}
 
|}
 
'''Teams will also make time for:'''  
 
'''Teams will also make time for:'''  

Revision as of 10:35, 3 November 2021

CSPS Digital Accelerator.png











Semaine 1 (Jan 10)

Day of the Week Time Topic Length Participants
Lundi Bienvenue à l’Accélérateur 1.5 heures Équipe de produit requise

Cadres supérieurs requis

Introduction à Miro 1 heure Équipe de produit requise

Cadres supérieurs optionnelle

Mardi Renforcement de l’esprit d’équipe 2.5 heures Équipe de produit requise

Cadres supérieurs requis

Conception centrée sur la personne 3 heures
Mercredi Exploration de l’espace du problème 2 heures Équipe de produit requise

Cadres supérieurs optionnelle

Jeudi
Vendredi Séance de suivi à la fin de la semaine 45 minutes Équipe de produit requise

Cadres supérieurs requis

Dîner‑causerie avec Liz 1 heure Présence de l’équipe de produit optionnelle

Cadres supérieurs optionnelle

Teams will also make time for:

  1. Team work (about 2 hours) - Product team only (required)

Week 2 (Jan 17)

Day of the Week Time Topic Length Participants
Monday Problem framing 2 hours Product team required

Executives optional

Tuesday Finding your users 2 hours Product team only (required)
Wednesday Agile 101 2 hours Product team required

Executives optional

Leading with Agility 2 hours Executives only (required)
Thursday
Friday End of week check-in 45 minutes Product team required

Executives required

Teams will also make time for:

  1. Team work (about 3 hours) - Product team only (required)

Week 3 (Jan 24)

Day of the Week Time Topic Length Participants
Monday Problem scope and output 2 hours Product team only (required)
Tuesday
Wednesday Introduction to pitching 1.5 hours Product team only (required)
Thursday
Friday Show and tell 2 hours Product team required

Executives required

Teams will also make time for:

  1. User research (about 3 hours) - Product team required, executives optional
  2. User synthesis (about 2 hours) - Product team and executives required
  3. Feedback for product teams (about 1 hour) - Product team and executives required

Week 4 (Jan 31)

Day of the Week Time Topic Length Participants
Monday Generating solution ideas / How-Might-We 2 hours Product team only (required)
Tuesday
Wednesday Leading with Agility 2 hours Executives only (required)
Scoping solution ideas for prototyping 2 hours Product team only (required)
Thursday Selecting solution ideas 2 hours Product team only (required)
Friday End of week check-in 45 minutes Product team required

Executives required

Teams will also make time for:

  1. Pitch day preparation and review (about 2 hours) - Product team and executives required

Week 5 (Feb 7)

Day of the Week Time Topic Length Participants
Monday How to give design critique 1 hour Product team required

Executives required

Prototyping tools and techniques 2 hours Product team only (required)
Tuesday
Wednesday Desirable, viable, feasible 1.5 hours Product team required

Executives required

Thursday Lo-fi prototype output 2 hours Product team only (required)
Friday Show and Tell 2 hours Product team required

Executives required

Teams will also make time for:

  1. Pitch day preparation and review (about 2 hours) - Product team and executives required

Week 6 (Feb 14)

Day of the Week Time Topic Length Participants
Monday User testing 2 hours Product team required

Executives optional

Tuesday
Wednesday Backlogs and Roadmaps 2 hours Product team required\

Executives optional

Leading with Agility 2 hours Executives only (required)
Thursday
Friday Pitch review with Accelerator team 30 minutes per team Product team required

Executives optional

Teams will also make time for:

  1. Pitch day preparation and review (about 1.5 hours) - Product team and executives required
  2. Team work to improve prototype (about 3 hours) - Product team only (required)
  3. User testing (about 5 hours) - Product team required, executives optional

Week 7 (Feb 21)

Day of the Week Time Topic Length Participants
Monday Pitch coaching 30 minutes per team Product team required

Executives optional

Tuesday Pitch day dry run 2 hours Product team required

Executives optional

Wednesday Attend pitch day 2.5 hours Product team required

Executives required

Thursday
Friday Pitch day debrief Product team required

Executives required

Teams will also make time for:

  1. Prototyping (about 5 hours) - Product team only (required)
  2. User testing and synthesis (about 3 hours) - Product team required, executives optional

Week 8 (Feb 28)

Day of the Week Time Topic Length Participants
Monday
Tuesday
Wednesday Leading with Agility 2 hours Executives only (required)
Thursday
Friday Show and tell 2 hours Product team required

Executives required

Teams will also make time for:

  1. Demo day pitch review (about 2 hours) - Product team and executives required
  2. Prototyping (about 5 hours) - Product team only (required)
  3. User testing and synthesis (about 3 hours) - Product team and executives required

Week 9 (Mar 7)

Day of the Week Time Topic Length Participants
Monday Demo day pitch coaching 45 minutes per team Product team required
Tuesday
Wednesday
Thursday
Friday Show and tell round 1 (5 teams) 3 hours Product team required

Executives required

Teams will also make time for:

  1. Demo day pitch review (about 2 hours) - Product team and executives required
  2. Prototyping (about 5 hours) - Product team only (required)
  3. User testing and synthesis (about 3 hours) - Product team and executives required

Week 10 (Mar 14)

Day of the Week Time Topic Length Participants
Monday Demo day pitch coaching 30 minutes per team Product team required
Tuesday
Wednesday Demo day dry run 1 hour Product team required

Executives optional

Thursday
Friday Show and tell round 2 (5 different teams) 3 hours Product team required

Executives required

Teams will also make time for:

  1. Prototyping (about 2.5 hours) - Product team only (required)
  2. Demo day pitch review (about 2 hours) - Product team and executives required
  3. User testing and synthesis (about 2 hours) - Product team and executives required

Week 11 - Final week! (Mar 21)

Day of the Week Time Topic Length Participants
Monday
Tuesday
Wednesday Attend Demo day! 3 hours Product team required

Executives required

Thursday Post-accelerator retro 2 hours Product team required

Executives required

Friday