GC EARB Presenter Template – SSC Appendix 3 Guidelines

From wiki
Revision as of 17:43, 7 May 2020 by Mohammed.algamoudi (talk | contribs) (Created page with "Security Profile, Availability, and Disaster Recovery Information: Security Profile: Provide the security profile for the solution (eg. PBMM, PBHM, etc). If the solution inclu...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Security Profile, Availability, and Disaster Recovery Information: Security Profile: Provide the security profile for the solution (eg. PBMM, PBHM, etc). If the solution includes multiple components with different security profiles, include all security profiles. Maximum Allowable Unplanned downtime: provide expected maximum allowable downtime in hours per year if system is expected to run 24/7, or general availability hours if the system is expected to run during business hours and have downtime otherwise. Availability requirements: Provide an estimate for availability requirements: Medium availability is 95%, High availability is >=99% Disaster Recovery: select expected disaster recovery needs • Hot Site: Facility and equipment are set up and ready to go, with either synchronous or asynchronous data replication. It is available and running 24/7. • Warm Site: Equipment is available and configured. Latest application data must loaded or restored. • Cold Site: Available space/facility where you need to set up the equipment, connectivity, load the software and data. • None: best effort disaster recovery. Authentication: select the authentication method from the options below. DCAM, ICM/ECM, or Sign in Canada are the preferred methods: • DCAM (Active Directory solution using ADFS) • ICM/ECM – GCKey, MyKey • Sign in Canada • Other: Specify the authentication method if none of the above are being used. Hosting Solution: Specify all hosting options: o End State Data Centre (specify EDC) o Legacy Data Centre (specify specific data centre) o Cloud – specify cloud solution Workload Migration: Is any workload migrating out of legacy data centres: Yes/No Network Details: • Network Connectivity: Specify the network(s) the solution will use: eg. GCNet, Science Net, GCSI, etc. • Solution Sensitivity to Network Delay: