Line 54: Line 54:  
|To perform needed maintenance to the High voltage Switchgear supplying power to Tower C.
 
|To perform needed maintenance to the High voltage Switchgear supplying power to Tower C.
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/5/57/CN67.2_-_D%C3%A9placement_de_la_salle_des_batteries_et_%C3%A9quipement_associ%C3%A9s_-_Re-Location_of_the_Switchgear_battery_room_and_associated_equipment_.pdf Re-location of Switchgear Battery Room and Associated Equipment]'''
+
|'''[https://wiki.gccollab.ca/images/5/57/CN67.2_-_D%C3%A9placement_de_la_salle_des_batteries_et_%C3%A9quipement_associ%C3%A9s_-_Re-Location_of_the_Switchgear_battery_room_and_associated_equipment_.pdf Re-location of Switchgear Battery Room and Associated Equipment (UPDATED)]'''
 
|March 10, 2023
 
|March 10, 2023