Line 78: Line 78:  
   
 
   
 
|To prepare the site for the construction and installation of the tower crane (TC-2).  
 
|To prepare the site for the construction and installation of the tower crane (TC-2).  
|-
  −
|'''[https://wiki.gccollab.ca/images/5/5f/CN53.1_Construction_Hoarding_Tower_B1_L4_L8.F1.pdf Tower B1: Delineation and Hoarding Wall (UPDATED)]'''
  −
|January 17, 2023
  −
  −
|To outline and separate the occupied space from the demolition and abatement activities.
   
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/7/73/CN55_Tower_E_Construction_of_Partition_Wall.F1.V2.pdf Tower E: Construction of Partition Wall]'''
 