Changes

Line 33: Line 33:  
!'''Release Date'''
 
!'''Release Date'''
 
!'''Purpose'''
 
!'''Purpose'''
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/2/24/CN60.1_Notice_of_Tower_Crane_%28TC-2%29_Installation_.pdf Notice of Tower Crane (TC-2) Installation]'''
 +
|February 16, 2023
 +
 +
|To install a tower crane (TC-2) within the construction zone in front of Place du Portage III Tower B on Laurier Street.
 
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/0/02/CN58.1_Electrical_Shutdown_in_Sub-Sector_Garage_mod_R1.pdf Electrical Shutdown in Laurier-Taché Parking Garage (Maisonneuve Sector) (UPDATED)]'''
 
|'''[https://wiki.gccollab.ca/images/0/02/CN58.1_Electrical_Shutdown_in_Sub-Sector_Garage_mod_R1.pdf Electrical Shutdown in Laurier-Taché Parking Garage (Maisonneuve Sector) (UPDATED)]'''
Line 38: Line 43:  
   
 
   
 
|To proceed with scheduled Tower C electrical maintenance.  
 
|To proceed with scheduled Tower C electrical maintenance.  
|-
  −
|'''[https://wiki.gccollab.ca/images/5/5d/CN60_Notice_of_Tower_Crane_%28TC-2%29_Installatio_R1.pdf Notice of Tower Crane (TC-2) Installation]'''
  −
|February 7, 2023
  −
  −
|To install a tower crane (TC-2) within the construction zone in front of Place du Portage III Tower B on Laurier Street.
   
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/d/d7/CN57._3_Tower_A_Storm_and_Sanitary_Pipe_Replacement.F2_.pdf Tower A: Storm and Sanitary Pipe Installation (UPDATED)]'''
 
|'''[https://wiki.gccollab.ca/images/d/d7/CN57._3_Tower_A_Storm_and_Sanitary_Pipe_Replacement.F2_.pdf Tower A: Storm and Sanitary Pipe Installation (UPDATED)]'''