Line 33: Line 33:  
!'''Release Date'''
 
!'''Release Date'''
 
!'''Purpose'''
 
!'''Purpose'''
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/e/eb/CN38.2_Structural_Steel_Upgrades_in_Laurier-Tach%C3%A9_Parking_Garage.F2.pdf Tower Crane 2 (TC-2): Structural Steel Upgrades (UPDATED)]'''
 +
|January 27, 2023
 +
 +
|To allow for the tower crane openings that are required for its erection in the Laurier-Taché Parking Garage through levels P1, P2 and P3.
 
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/9/91/CN17.1_Mission_Critical_Spaces_Tower_A-F1.pdf Mission Critical Spaces (L15)]'''
 
|'''[https://wiki.gccollab.ca/images/9/91/CN17.1_Mission_Critical_Spaces_Tower_A-F1.pdf Mission Critical Spaces (L15)]'''
Line 109: Line 114:  
   
 
   
 
|To assist in the removal of the exterior envelope of Towwers C1/C2.
 
|To assist in the removal of the exterior envelope of Towwers C1/C2.
|-
  −
|'''[https://wiki.gccollab.ca/images/5/52/CN38.1_Structural_Steel_Upgrades_in_Laurier-Tach%C3%A9_Parking_Garage.F.pdf Tower Crane 2 (TC-2): Structural Steel Upgrades (UPDATED)]'''
  −
|November 25, 2022
  −
  −
|To allow for the tower crane openings that are required for its erection in the Laurier-Taché Parking Garage through levels P1, P2 and P3.
   
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/c/c0/CN44_Temporary_Shutdown_of_Primary_Chilled_Water_Loop.F.Nov25.pdf Temporary Shutdown of Primary Chilled Water Loop (UPDATED)]'''
 
|'''[https://wiki.gccollab.ca/images/c/c0/CN44_Temporary_Shutdown_of_Primary_Chilled_Water_Loop.F.Nov25.pdf Temporary Shutdown of Primary Chilled Water Loop (UPDATED)]'''