|'''[ https://wiki.gccollab.ca/images/f/f6/CN29.2_Tower_Crane_Installation_Laurier-Tach%C3%A9_Parking_Garage.F2.pdf Tower Crane Installation in Laurier-Taché Parking Garage (UPDATED)]'''
 +
|January 19, 2023
 +
 +
|To prepare the site for the construction and installation of the tower crane (TC-2).
 
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/3/3a/CN54.1_Tower_D_and_E_Delineation_Hoarding.F2.pdf Towers D & E: Delineation and Hoarding Wall (UDPATED)]'''
 
|'''[https://wiki.gccollab.ca/images/3/3a/CN54.1_Tower_D_and_E_Delineation_Hoarding.F2.pdf Towers D & E: Delineation and Hoarding Wall (UDPATED)]'''
Line 89: Line 94:  
   
 
   
 
|To allow for the tower crane openings that are required for its erection in the Laurier-Taché Parking Garage through levels P1, P2 and P3.
 
|To allow for the tower crane openings that are required for its erection in the Laurier-Taché Parking Garage through levels P1, P2 and P3.
|-
  −
|'''[https://wiki.gccollab.ca/images/8/81/CN29.1_Tower_Crane_Installation-Laurier-Tach%C3%A9ParkingGarage.F.pdf Tower Crane Installation in Laurier-Taché Parking Garage (UPDATED)]'''
  −
|November 25, 2022
  −
  −
|To prepare the site for the construction and installation of the tower crane (TC-2).
   
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/c/c0/CN44_Temporary_Shutdown_of_Primary_Chilled_Water_Loop.F.Nov25.pdf Temporary Shutdown of Primary Chilled Water Loop (UPDATED)]'''
 
|'''[https://wiki.gccollab.ca/images/c/c0/CN44_Temporary_Shutdown_of_Primary_Chilled_Water_Loop.F.Nov25.pdf Temporary Shutdown of Primary Chilled Water Loop (UPDATED)]'''