Changes

Line 33: Line 33:  
!'''Release Date'''
 
!'''Release Date'''
 
!'''Purpose'''
 
!'''Purpose'''
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/3/3a/CN54.1_Tower_D_and_E_Delineation_Hoarding.F2.pdf Towers D & E: Delineation and Hoarding Wall]'''
 +
|January 18, 2022
 +
 +
|To outline and separate the occupied space from the demolition and abatement activities.
 
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/5/5f/CN53.1_Construction_Hoarding_Tower_B1_L4_L8.F1.pdf Tower B1: Delineation and Hoarding Wall (UPDATED)]'''
 
|'''[https://wiki.gccollab.ca/images/5/5f/CN53.1_Construction_Hoarding_Tower_B1_L4_L8.F1.pdf Tower B1: Delineation and Hoarding Wall (UPDATED)]'''
Line 53: Line 58:  
   
 
   
 
|To remove, then relocate the fiber optic cables, including conduits and boxes that control the garage door openers within the Laurier-Taché parking garage. The conduits and boxes are currently located in L02 in Tower C on a block wall that is scheduled to be demolished.  
 
|To remove, then relocate the fiber optic cables, including conduits and boxes that control the garage door openers within the Laurier-Taché parking garage. The conduits and boxes are currently located in L02 in Tower C on a block wall that is scheduled to be demolished.  
|-
  −
|'''[https://wiki.gccollab.ca/images/7/76/CN54_Tower_D_and_E_Delineation_Hoarding.F.pdf Towers D & E: Delineation and Hoarding Wall]'''
  −
|December 22, 2022
  −
  −
|To outline and separate the occupied space from the demolition and abatement activities.
   
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/0/08/CN-42_Opening_of_Interim_Mailroom.F.pdf Opening of Interim Mailroom]'''
 
|'''[https://wiki.gccollab.ca/images/0/08/CN-42_Opening_of_Interim_Mailroom.F.pdf Opening of Interim Mailroom]'''