|'''[https://wiki.gccollab.ca/images/7/73/CN55_Tower_E_Construction_of_Partition_Wall.F1.V2.pdf Tower E: Construction of Partition Wall«]'''
 +
|January 6, 2023
 +
 +
|To outline and separate the occupied space from the bulk of demolition and abatement activities while the Security Operations Centre remains in place (02B2-101).
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/f/f5/CN57_Tower_A_Storm_and_Sanitary_Pipe_Replacement.F.pdf Tower A: Storm and Sanitary Pipe Installation]'''
 +
|January 4, 2023
 +
 +
|To demolish the existing pipe and reinstall a new underground sanitary and storm one in L03 (A0314) in Tower A.
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/d/d3/CN56_Temporary_Disruption_to_Garage_Door_Openers.F1_%282%29.pdf Temporary Disruption to the Laurier-Taché Parking Garage Door Operators]'''
 +
|January 3, 2023
 +
 +
|To remove, then relocate the fiber optic cables, including conduits and boxes that control the garage door openers within the Laurier-Taché parking garage. The conduits and boxes are currently located in L02 in Tower C on a block wall that is scheduled to be demolished.
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/8/84/CN53_Construction_Hoarding_Tower_B1_L4_L8.F2.pdf Towers B1: Delineation and Hoarding Wall]'''
 +
|December 23, 2022
 +
 +
|To outline and separate the occupied space from the demolition and abatement activities.
 
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/7/76/CN54_Tower_D_and_E_Delineation_Hoarding.F.pdf Towers D & E: Delineation and Hoarding Wall]'''
 
|'''[https://wiki.gccollab.ca/images/7/76/CN54_Tower_D_and_E_Delineation_Hoarding.F.pdf Towers D & E: Delineation and Hoarding Wall]'''