|To outline and separate the occupied space in Tower A2 from the construction activities in Tower B1.  
 
|To outline and separate the occupied space in Tower A2 from the construction activities in Tower B1.  
|-
  −
|'''[https://wiki.gccollab.ca/images/5/50/Tower_B_Exterior_Civil_Works.F.pdf Tower B: Exterior Demolition]'''
  −
|September 20, 2022
  −
  −
|To install temporary new stairs to allow, emergency access and egress during construction activities, and the demolition of the existing stairs. These enabling work activities are required to set up the ElissDon laydown area for construction.
   
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/3/34/GOC479411_AWR_PDP3_-_Bicycle_Shelter_New_Location.Final.pdf Bicycle Enclosure Relocation]'''
 
|'''[https://wiki.gccollab.ca/images/3/34/GOC479411_AWR_PDP3_-_Bicycle_Shelter_New_Location.Final.pdf Bicycle Enclosure Relocation]'''