Changes

Line 33: Line 33:  
!'''Release Date'''
 
!'''Release Date'''
 
!'''Purpose'''
 
!'''Purpose'''
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/8/82/CN27.2_Tower_B_Exterior_Civil_WorksF.pdf Tower B: Exterior Demolition (UPDATED)]'''
 +
|December 19, 2022
 +
 +
|To install temporary new stairs to allow emergency access and egress during construction activities and demolish existing stairs.
 
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/4/47/CN52_Mobile_Crane_Preparation.F.pdf Preparation of the Mobile Crane Base]'''
 
|'''[https://wiki.gccollab.ca/images/4/47/CN52_Mobile_Crane_Preparation.F.pdf Preparation of the Mobile Crane Base]'''
Line 83: Line 88:  
   
 
   
 
|To complete Place du Portage III Asset and Workplace Renewal (PDP3 AWR) Project scheduled renovations.
 
|To complete Place du Portage III Asset and Workplace Renewal (PDP3 AWR) Project scheduled renovations.
|-
  −
|'''[https://wiki.gccollab.ca/images/3/3f/CN27.1_Tower_B_Exterior_Civil_Works.Final.Nov17.pdf Tower B: Exterior Demolition]'''
  −
|November 17, 2022
  −
  −
|To install temporary new stairs to allow emergency access and egress during construction activities and demolish existing stairs.
   
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/2/2b/CN35_fermeture_temporaire_acc%C3%A8s_au_quai_de_chargement_PDC-Temporary_Closure_of_Access_Route_to_Place_du_Centre_Loading_Dock02N.2022.pdf Place du Centre: Temporary Closure of Access Route to Loading Dock]'''
 
|'''[https://wiki.gccollab.ca/images/2/2b/CN35_fermeture_temporaire_acc%C3%A8s_au_quai_de_chargement_PDC-Temporary_Closure_of_Access_Route_to_Place_du_Centre_Loading_Dock02N.2022.pdf Place du Centre: Temporary Closure of Access Route to Loading Dock]'''