Changes

Line 54: Line 54:  
|To directly reconnect critical mechanical equipment (V-30, V-72 and V-74) to the primary chilled water loop to accommodate the demolition of the pumps and heat exchangers in Tower C Level 02. Space in the mechanical room is required for construction of the concrete shear wall and associated re-shoring.
 
|To directly reconnect critical mechanical equipment (V-30, V-72 and V-74) to the primary chilled water loop to accommodate the demolition of the pumps and heat exchangers in Tower C Level 02. Space in the mechanical room is required for construction of the concrete shear wall and associated re-shoring.
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/8/84/CN45_Demolition_Tower_B1_and_B3_%28L6-L12%29.F.Nov17_%28002%29.pdf Towers B1 & B3: Demolition and Construction Activities (L6 to L2)]'''
+
|'''[https://wiki.gccollab.ca/images/8/84/CN45_Demolition_Tower_B1_and_B3_%28L6-L12%29.F.Nov17_%28002%29.pdf Towers B1 & B3: Demolition and Construction Activities (L6 to L12)]'''
 
|November 17, 2022
 
|November 17, 2022