Changes

Line 33: Line 33:  
!'''Release Date'''
 
!'''Release Date'''
 
!'''Purpose'''
 
!'''Purpose'''
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/e/ec/CN49_Removal_of_Emergency_Generator_Tower_C.Bgis.pdf Tower C: Emergency Generator Removal]'''
 +
|November 18, 2022
 +
 +
|To disconnect the Tower C generator and then reconnect its emergency load to the generator control panel in Tower B to ensure backup electricity in the event of an electrical power outage.
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/d/d5/CN41_Construction_Hoarding-Tower_B1-L0.F.Nov17docx.pdf Tower B1 - Level 0: Construction Hoarding]'''
 +
|November 17, 2022
 +
 +
|To create a safe delineation between tenants and the construction zone in preparation of the PDP3 AWR Project.
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/7/73/CN46_Demolition_Tower_B1_and_B3_%28L1_L2_L3%29F.Nov17.pdf Towers B1 & B3: Demolition and Construction Activities (L1, L2 & L3)]'''
 +
|November 17, 2022
 +
 +
|To complete Place du Portage III Asset and Workplace Renewal (PDP3 AWR) Project scheduled renovations.
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/4/47/CN44_Temporary_Shutdown_of_Primary_Chilled_Water_Loop.F.Nov17.pdf Temporary Shutdown of Primary Chilled Water Loop]'''
 +
|November 17, 2022
 +
 +
|To directly reconnect critical mechanical equipment (V-30, V-72 and V-74) to the primary chilled water loop to accommodate the demolition of the pumps and heat exchangers in Tower C Level 02. Space in the mechanical room is required for construction of the concrete shear wall and associated re-shoring.
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/8/84/CN45_Demolition_Tower_B1_and_B3_%28L6-L12%29.F.Nov17_%28002%29.pdf Towers B1 & B3: Demolition and Construction Activities (L6 to L2)]'''
 +
|November 17, 2022
 +
 +
|To complete Place du Portage III Asset and Workplace Renewal (PDP3 AWR) Project scheduled renovations.
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/3/3f/CN27.1_Tower_B_Exterior_Civil_Works.Final.Nov17.pdf Tower B: Exterior Demolition]'''
 +
|November 17, 2022
 +
 +
|To install temporary new stairs to allow emergency access and egress during construction activities and demolish existing stairs.
 
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/9/93/CN48_Construction_of_Safety_Orientation_Room.final.pdf Construction of Safety Orientation Room]'''
 
|'''[https://wiki.gccollab.ca/images/9/93/CN48_Construction_of_Safety_Orientation_Room.final.pdf Construction of Safety Orientation Room]'''