Changes

Line 53: Line 53:  
   
 
   
 
|Outline and separate the occupied space in Tower A2 from the construction activities in Tower B1.
 
|Outline and separate the occupied space in Tower A2 from the construction activities in Tower B1.
   
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/c/c5/2-Interim_Mailroom_Demolition_and_Abatement.pdf Interim Mailroom Demolition and Abatement]'''
 
|'''[https://wiki.gccollab.ca/images/c/c5/2-Interim_Mailroom_Demolition_and_Abatement.pdf Interim Mailroom Demolition and Abatement]'''
Line 59: Line 58:  
   
 
   
 
|See notice
 
|See notice
 +
|-
 +
|'''[https://wiki.gccollab.ca/images/1/1d/GOC479411-PDP_3_AWR-Tower_A_and_B_Delineation_Hoarding.F.pdf Interim Mailroom Construction]'''
 +
|June 20, 2022
 +
 +
|See notice.
 
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/6/61/GOC479411-_PDP_3_AWR-_CM-_Avis_-_Maisonneuve.pdf Sidewalk and Lane Closure on Maisonneuve Boulevard]'''
 
|'''[https://wiki.gccollab.ca/images/6/61/GOC479411-_PDP_3_AWR-_CM-_Avis_-_Maisonneuve.pdf Sidewalk and Lane Closure on Maisonneuve Boulevard]'''