Changes

Line 34: Line 34:  
!'''Purpose'''
 
!'''Purpose'''
 
|-
 
|-
|'''[https://wiki.gccollab.ca/images/7/7a/GOC479411-PDP_3_AWR-Note.Laurier-Tache_Parking_Garage.F.pdf Temporary and Partial Closure: Laurier-Taché Parking Garage]'''
+
|'''[https://wiki.gccollab.ca/images/2/22/Laurier-Tache_Parking_Garage_Closure-Maisonneuve.Final.pdf Temporary Partial Closure: Laurier-Taché Parking Garage]'''
 
|July 29, 2022
 
|July 29, 2022
 
   
 
   
|To facilitate construction renovations. Reasons for the partial closure include: the installation of a new elevator pit; an interruption in the ventilation system; structural upgrades, and replacement of underground piping.
+
|To facilitate the following renovations: installation of a new elevator pit; an interruption in the ventilation system; structural upgrades; and replacement of underground piping.
 
|-
 
|-
 
|'''[https://wiki.gccollab.ca/images/d/d2/GOC479411-PDP_3_AWR-Place_de_Portage_IV_Bike_Storage.Final.pdf Relocation of the bicycle storage shelter at Tower C2 entrance hall at Level 02]'''
 
|'''[https://wiki.gccollab.ca/images/d/d2/GOC479411-PDP_3_AWR-Place_de_Portage_IV_Bike_Storage.Final.pdf Relocation of the bicycle storage shelter at Tower C2 entrance hall at Level 02]'''